P-numbers, F-numbers and A-numbers in ASME Section IX

A P-number groups base metals with similar welding behaviour, so a procedure or welder test on one covers the others in the group: P-No. 1 is carbon steel, P-No. 8 austenitic stainless. F-numbers group filler metals by usability, such as F-4 for low-hydrogen electrodes like E7018, and A-numbers group steel weld metal by chemistry.

Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

A tray of metal sample coupons in carbon steel, stainless steel, copper and aluminum: base metals grouped by P-number.
Video chapters (10)
  1. 0:00P-Numbers, F-Numbers & A-Numbers Overview (ASME Section IX)
  2. 0:22How QW/QB-422, QW-432 & QW-442 Feed Every WPS & Form QW-483 PQR
  3. 0:44Common Base Metal P-Numbers (P-1 through P-15E & Nonferrous P-21–53)
  4. 1:05Group Numbers (SA-516 Gr. 70 = P-1 Gr. 2), Impact Tests & P-1 to P-8
  5. 1:28Filler Metal F-Numbers (QW-432), Section II Part C & Table QW-433
  6. 1:46Weld Deposit A-Numbers (QW-442), Essential Variable & Form QW-483
  7. 2:06Official ASME Sources: Sec II Part C, QW-483 & 2025 Paid Tables
  8. 2:26Linking WPS P-Number Ranges to Plate Heat MTRs in Boiler ERP
  9. 2:482025 Edition Notice & Authorized Inspector Verification
  10. 3:00Next Steps: Mill Test Reports (S38), Essential Variables (S35) & Materials (S05)

What is a P-number in welding?

A P-number is Section IX's group for base metals that weld alike, so that a procedure qualified on one material covers the others in its group. There are thousands of material specifications; without grouping, every pairing would need its own procedure test. Section IX lists the assignments in QW/QB-422, by specification and grade. Section IX is ASME's paid Code; this guide gives common cases, and the 2025 tables are the authority.

What are the common P-numbers?

P-No.MaterialsExamples
1Carbon and carbon-manganese steelsSA-516 Gr 70, SA-106 Gr B, SA-105
3C–½Mo and low-chromium steelsSA-204, SA-335 P1
41–1¼Cr–½Mo steelsSA-387 Gr 11, SA-335 P11
5A2¼Cr–1Mo steelsSA-387 Gr 22, SA-335 P22
5B5Cr to 9Cr steelsSA-335 P5, P9
7Ferritic stainlessSA-240 Type 405, 409, 430
8Austenitic stainlessSA-240 Type 304, 316, 321
10HDuplex stainlessSA-240 S31803, S32205
15ECreep-strength enhanced ferritic steelsSA-335 P91
21–26Aluminum alloysSB-209 5083
31–35Copper alloysSB-171
41–49Nickel alloysSB-168 Alloy 600, SB-443 Alloy 625
51–53TitaniumSB-265 Grade 2

The base metal's specification and grade come from its MTR; see Section II for SA versus ASTM A specifications.

What P-number is SA-516 Grade 70?

P-No. 1, Group 2. SA-516 is the carbon steel plate most pressure vessel and boiler shops buy, and Grade 70 sits in Group 2 of P-No. 1 with other carbon steels of its strength. Check the grade's line in QW/QB-422 of the edition you're working to before writing it on a WPS.

What is a Group number for?

Group numbers split a ferrous P-number by toughness behaviour. They matter only when the construction code requires impact testing: a change of Group number is then a supplementary essential variable, so a PQR on P-No. 1 Group 1 may not cover Group 2 for impact-tested work. See essential variables and impact testing.

Do I need a new PQR to weld P-No. 1 to P-No. 8?

Yes. A joint between two different P-numbers is a dissimilar-metal joint and needs a procedure qualified for that combination (or one the rules let it cover), usually with a nickel alloy or austenitic filler. A PQR for P-No. 1 to P-No. 1 does not cover it.

What is an F-number?

An F-number groups filler metals by usability, meaning how hard they are to weld with (QW-432):

F-No.FillerExample
1Heavy iron-powder steel electrodesE7024
2Rutile steel electrodesE6013
3Cellulosic steel electrodesE6010, E6011
4Low-hydrogen steel electrodesE7018
5Stainless steel electrodesE308L-16
6Solid and metal-cored steel wires and rods (GTAW, GMAW, SAW)ER70S-6
43Nickel alloy fillerERNiCrMo-3

The filler metal specifications themselves (SFA-5.1 for carbon steel covered electrodes, SFA-5.18 for wires and rods) are in Section II Part C, which ASME lists among the required code books for certificate holders that weld.

Does an F-4 welder qualify for E6010?

Generally yes within the same process: F-numbers matter most for welders, and a welder qualified with an F-4 electrode is generally also qualified for F-1 to F-3, but not the other way round. Section IX's QW-433 table sets the exact pairings, including the effect of welding with or without backing, so check it before assigning a welder.

What is an A-number?

An A-number classifies the chemistry of deposited steel weld metal (QW-442): A-1 carbon steel, A-2 carbon–molybdenum, up to A-8 austenitic chromium–nickel and others. A change of A-number is a procedure essential variable for most processes, so a PQR made with a carbon steel filler doesn't cover a chromium–molybdenum one.

Where should P-, F- and A-numbers be recorded?

On every WPS and PQR: ASME's suggested PQR format (QW-483) has fields for them, and reviewers check them first. Check a material's P-number in the current edition, since new materials are added and occasionally regrouped. The documents themselves are explained in WPS vs PQR vs WPQ.

How does this connect to material traceability?

The P-number on a WPS is only as good as the record that says which plate is in which seam. A shop that keeps each piece's heat number when plate is cut can show which specification, grade and P-number went into every weld; see MTRs and heat numbers. Our US boiler demo prints each WPS with its P-number range (for example P-No. 1 to P-No. 1) next to MTRs by heat number in the job's ASME record package.

Quoted from the official text (2)

“BPVC Section II-Materials Part C-Specifications for Welding Rods Electrodes and Filler Metals”

ASME Required Code Books, U and UM certificates

“Suggested Format for Procedure Qualification Records (PQR)”

ASME Data Report Forms, QW-483

WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.

A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.

A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.

What this page is not

A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.