Interior BOQ format, Excel template and free checker

How to write a bill of quantities for interior work in India that two contractors would price the same way: 41 common items across 9 trades with the unit each is priced in, how it is measured, the Indian Standards that apply and what every line must name, plus a free checker that reads your BOQ straight from Excel.

Pujan Motiwala · Standards checked against the BIS catalogue on

Tools

  • Check a BOQ and turn it into a quotation

    Paste rows from Excel. Each line is matched to the item library and flagged where it leaves the material, size, finish, unit or measurement open. Then add rates and GST and print it. Nothing leaves your browser.

  • Interior BOQ item library

    41 items in 9 trades: unit, how it's measured, the Indian Standard that applies, what the line must name, what quotes leave out, and a line you can paste.

  • Interior BOQ format in Excel

    Every item in the library as a blank BOQ, one sheet, grouped by trade, with a measurement-basis column and the amount and total formulas in place. What each column is for, and why there are no rates.

Guides

  • What is a BOQ? BOQ vs estimate, quotation and BOM

    A bill of quantities (BOQ) lists every item of work with its description, unit and quantity, measured from the drawings before anyone prices it. Contractors fill in the rates, so three quotes can be compared line by line. An estimate is the expected cost, a quotation is a priced offer, and a BOM lists the parts of one product.

  • How to make an interior BOQ, step by step

    Make an interior BOQ in 7 steps: read the drawings and finish schedule, split the work room by room and trade, pick each item and its unit, measure and state how, name the material, size, finish and hardware, list exclusions, then price it. A line two contractors would read differently is the line that causes the dispute.

  • How interior work is measured for a BOQ (IS 1200)

    Floors, ceilings, paint and woodwork have an Indian Standard for measurement, IS 1200: measure net as fixed, deduct openings only above a set size, and price skirting by running length with its height stated. Modular kitchens and wardrobes have none, so a BOQ line must say its basis: the same wardrobe can be 60 sq ft or 8 running ft.

  • Board standards for an interior BOQ: IS 303, IS 710 and others

    An interior BOQ names the board by its Indian Standard and grade, because "plywood" alone can be priced as the cheapest sheet in the market. IS 303 covers general-purpose plywood (MR, and BWR, renamed BWP by amendment), IS 710 marine plywood, IS 1659 block boards, and IS 3087 and IS 12823 particle boards.

  • Variation orders in interior work, priced from the BOQ

    A variation order records a change after the BOQ is agreed: what was added, omitted or substituted, at what rate, and its effect on time and payment, signed before the work is done. CPWD's contract conditions price a changed item at its BOQ rate, a new item at a market rate claimed within 15 days, and extend time in proportion to the added cost.

Items by trade

  • Civil and demolition 4 items. Breaking out, new partitions and plaster before the interior work starts.
  • False ceiling 4 items. Gypsum, grid and POP ceilings, with the coves and bands priced apart from the flat field.
  • Flooring and wall tiling 5 items. Tile, stone and wood floors, skirting and dado.
  • Carpentry and joinery 6 items. Panelling, storage units, beds, vanities, doors and frames made on site or in a workshop.
  • Modular kitchen 6 items. Base, wall and tall units, the countertop and the fittings, each its own line.
  • Wardrobes 4 items. Hinged and sliding wardrobes, lofts and internal drawers.
  • Painting and polishing 4 items. Wall and ceiling paint, textures, wood polish and enamel.
  • Electrical 4 items. Wiring points, distribution boards, light fittings and data points.
  • Plumbing and bathrooms 4 items. Concealed piping, waterproofing, sanitaryware and CP fittings.

Paste a BOQ from Excel and see what each line leaves open, then print it as a quotation.

Free. Runs in your browser; the rows never leave it.

Designer Ops keeps your own BOQ library and every quote, turns an accepted quote's payment stages into invoices, then runs the project: orders, site visits and the workshop. Try the live demo · system for interior designers · what to require from one

Official sources

What this page is not

A guide written by Ahrom Labs; not legal, tax or engineering advice. Indian Standards are cited by number and title from the BIS catalogue, not quoted; the standard governs wherever this page differs from it. No rates are given: they change with city and month. Last updated .