Essential and nonessential variables in ASME Section IX

ASME Section IX classifies each welding variable. Changing an essential variable, such as the base metal P-number, filler F-number, thickness range or post-weld heat treatment, needs a new PQR. Supplementary essential variables count only when impact testing is required. Nonessential variables, such as groove design, can change by revising the WPS.

Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

A portable welding machine with three dials, a switch and its cable: the variables of a welding procedure.
Video chapters (10)
  1. 0:00Essential, Supplementary & Nonessential Welding Variables Overview
  2. 0:20QW-250 Process Tables & 3-Step Variable Decision Flow
  3. 0:46Side-by-Side Comparison: Preheat Drop, Heat Input, PWHT & Groove Design
  4. 1:04Thickness Caps (QW-451: 2× & 8 in), PWHT (QW-407) & Welder Rules (QW-350)
  5. 1:28Worked Example: 3/4 in As-Welded PQR vs. 2 in PWHT Shell
  6. 1:50Multi-PQR WPSs, PQR Register Discipline, QW-483 & Jan 1, 2026 Cutoff
  7. 2:08Official Citations: Section IX Scope, QW-483 & AWS Journal (2025)
  8. 2:28Checking Seam Thickness & PWHT Against WPS Ranges in Boiler ERP
  9. 2:462025 Edition Notice & Authorized Inspector Verification
  10. 3:00Next Steps: Welder Qualification (S36), WPS/PQR/WPQ (S34) & PWHT (S32)

What are essential variables in ASME welding?

Essential variables are the welding conditions that affect a weld's mechanical properties, so changing one beyond what a PQR covers needs a new PQR. Section IX classifies every variable for every process in its variable tables (QW-250 onwards for procedures, QW-350 onwards for welders) as essential, supplementary essential or nonessential. A procedure test proves one set of conditions; the tables say how far you can move from it before you test again. The Code text is ASME's and paid; this guide gives common examples, and your 2025 tables are the authority.

What are the three kinds of procedure variable?

KindIf you change it beyond the PQRTypical examples
EssentialQualify a new PQRBase metal P-number; filler F-number and A-number; thickness beyond the qualified range; adding or removing post-weld heat treatment; a decrease in preheat of more than 100 °F (56 °C); a change of process; adding or removing shielding or backing gas in some processes
Supplementary essentialNew PQR only if the construction code requires impact testingGroup number within a P-number; an increase in heat input; single to multi-pass in some processes
NonessentialRevise the WPS; no new testGroove design, backing type, technique details, cleaning methods

The exact list differs by process (SMAW, GTAW, GMAW, SAW, FCAW), so read the table for the process on your WPS.

When do supplementary essential variables apply?

Only when the construction code requires toughness (impact) testing of the weld. Then a change in, for example, the base metal Group number or an increase in heat input needs a PQR with impact tests in that condition. Impact-tested work is where supplementary essentials catch shops out; see MDMT and impact testing.

What thickness range does a PQR qualify?

A groove-weld PQR qualifies a range of base metal thickness and of deposited weld metal thickness from the coupon's thickness (QW-451). As a general picture, a coupon of moderate thickness qualifies from a minimum up to twice its thickness, and a coupon 1½ in (38 mm) or thicker qualifies up to 8 in (203 mm); impact-tested work changes the lower limit. Check QW-451 for the coupon you weld.

Can you show a worked example?

A shop holds a PQR on ¾ in (19 mm) P-No. 1 plate, SMAW with E7018 (F-4, A-1), no PWHT. It can write a WPS for P-No. 1 from about 3/16 in up to 1½ in, as-welded. A new job needs a 2 in shell with PWHT: that is outside the thickness range and adds PWHT, two essential variables, so the shop welds a new coupon (for example 1½ in thick, heat treated) before issuing the WPS. Changing the groove angle on the same job needs only a WPS revision.

What are a welder's essential variables?

QW-350 onwards: the process, position, backing (welding without backing when qualified only with it), the filler F-number, and the diameter and deposited thickness ranges. Changing one beyond the WPQ means a new welder test. See welder qualification.

Does PWHT count as an essential variable?

Yes. Adding or removing post-weld heat treatment, or changing its temperature and time range, is a procedure essential variable (QW-407), so the PQR must have been heat treated the way the job will be. See PWHT.

Can one WPS cite two PQRs?

Yes, for example to cover two thickness ranges, provided every essential variable on the WPS is covered by at least one of the PQRs. Keep a PQR register with each PQR's qualified ranges worked out once: most WPS errors are ranges copied wrong. ASME's suggested PQR format (QW-483) lays the variables out in the order of the tables.

Did the 2025 Edition change the variables?

Section IX changes in every edition, and the 2025 changes apply to new qualifications from 1 January 2026, as the American Welding Society's summary notes. Check the "Summary of Changes" at the front of your 2025 Section IX before relying on any list here, including this one.

What does our software keep for it?

Our US boiler demo prints each WPS with its PQR, P-numbers, thickness range and PWHT condition in the job's ASME record package, next to the weld map that shows which WPS each seam used, so a reviewer can see each seam's thickness against the WPS range. See ERP for boiler and pressure vessel shops.

Quoted from the official text (3)

“Section IX of the BPVC contains rules relating to the qualification of welding, brazing, and fusing procedures as required by other BPVC sections.”

ASME Section IX product page, description

“Suggested Format for Procedure Qualification Records (PQR)”

ASME Data Report Forms, QW-483

“These changes will become mandatory for new qualifications on January 1, 2026.”

AWS Welding Journal, July 2025 (Sperko)

WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.

A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.

A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.

What this page is not

A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.