ERP and compliance glossary
The vocabulary Ahrom uses to model a business. These are the terms the architecture is built from.
Structure
- Entity
- A distinct thing the business tracks: a customer, an order, an employee, an asset. Entities are the nouns the rest of the system refers to.
- Relationship
- A defined connection between two entities, such as which customer placed which order. Relationships are modeled directly, not inferred from matching IDs across separate tables.
- Workflow
- A sequence of steps that moves an entity from one state to another, with a defined owner at each step.
- Dependency
- A requirement that one step, entity, or workflow places on another before it can proceed.
Governance
- Permission
- A rule defining who can view, change, or act on a given entity or workflow step, defined once and enforced everywhere that entity appears.
- Business rule
- A constraint the business enforces regardless of which application is being used, such as an approval threshold or an eligibility condition.
- State transition
- A recorded change in an entity's status, such as an order moving from placed to fulfilled, along with what caused the change.
Truth
- Data
- The recorded facts a business has about its entities and events, structured according to the model rather than scattered across tools.
- Decision
- A choice made by a person or a system that changes what happens next, tracked as its own record rather than only its downstream effect.
- Evidence
- The data and events that justified a decision, kept attached to that decision so the reasoning can be reviewed later.
- Cross-department process
- A workflow that spans more than one team, such as sales handing off to fulfillment, modeled as one continuous process rather than as separate steps in separate tools.
- AI hallucination
- When an AI model states something that isn't in the data it was given, such as a total it added up wrong, a rounded figure or a name it invented, in the same confident tone as a true answer.
- Grounding check
- A check that every figure in an AI answer appears in the data the answer was built from; a sentence that fails it is dropped instead of shown.
- Fixed look-up
- A read-only database query written in advance for one kind of question, with only the values (a client, a period) filled in at the time it runs, so the same question always gets the same maths as the app's screens.
- Text-to-SQL
- An AI design where the model writes a database query from the user's question and the result is shown as the answer; flexible, but the model decides the maths, so a query that is slightly wrong gives a figure that is slightly wrong.
- Model Context Protocol (MCP)
- An open standard for connecting AI apps such as ChatGPT and Claude to other software: the software runs an MCP server that lists a few tools, and the AI app calls them while it talks to a person.
- Tool calling
- The way an AI model uses software: instead of answering from memory, it asks for a named tool to be run with certain inputs, reads the result, and answers from it.
- Human in the loop
- A design in which an AI system prepares an action but a person reviews and approves it before it takes effect.
- Prompt injection
- An attack in which text hidden in a document, email or web page tries to give instructions to an AI model that reads it, for example to ignore its rules or send data somewhere.
- Descriptive analytics
- Analytics that answers what happened: totals, counts and lists from records, such as billing this month, stock by store or dues by customer.
- Diagnostic analytics
- Analytics that answers why something happened, by comparing a figure with a plan, a norm, a previous period or a rule.
- Predictive analytics
- Analytics that answers what is likely to happen, such as which items will run out in 30 days or whether a site will finish over budget.
- Prescriptive analytics
- Analytics that answers what to do: a ranked recommendation with the reason and the records behind it, such as which purchase to bring forward or which delay to deal with first.
Operations and compliance
- Audit trail (edit log)
- A record, kept by accounting software for every transaction, of each change made to the books and the date it was made, which the user cannot switch off.
- E-invoice and IRN (invoice reference number)
- A B2B invoice, credit note or debit note registered on the GST invoice registration portal (IRP), which returns an invoice reference number (IRN) and a signed QR code.
- E-way bill
- The electronic document generated on the GST e-way bill system before goods move, required under rule 138 of the CGST Rules for a consignment value exceeding ₹50,000.
- Three-way match
- Checking each supplier bill against its purchase order and the goods actually received before it is approved for payment.
- Stock reservation
- Setting physical stock aside against a specific customer order line, so the same unit can't be promised to two customers.
- Material traceability
- Following each piece of material, with its heat or batch and its test certificate, from receipt through cutting into the product it became.
- MSME payment rule
- The rule that a buyer must pay a micro or small enterprise supplier by the agreed date, which can never be more than 45 days from acceptance, or within 15 days where there is no written agreement.
- TDS on purchase of goods
- Tax a buyer deducts when paying a seller for goods beyond ₹50 lakh in a year, where the buyer's turnover exceeded ₹10 crore in the preceding year.
- Reverse charge
- A GST arrangement where the buyer, not the supplier, pays the tax on certain purchases.
- Fixed-asset register
- The record of a business's fixed assets with their cost, the date each was put to use, and depreciation.
- Role-based access
- Controlling what each person can see and do by their role, enforced by the system itself rather than by hiding things on screen.
- Data migration
- Moving records from an old system or spreadsheets into a new one, checked so that nothing is lost or attached to the wrong record.
- Bill of quantities (BOQ)
- A list of every item of work with its description, unit and quantity, measured from the drawings before anyone prices it, so contractors fill in rates and their quotes can be compared line by line.
- Variation order
- A record of a change after the BOQ is agreed: what was added, omitted or substituted, at what rate, and its effect on time and payment, signed before the changed work is done.
- Measurement basis
- The rule a BOQ line is measured by: square metres, running metres or numbers, and what is deducted. Floors, ceilings, paint and woodwork follow IS 1200; modular kitchens and wardrobes have no standard, so the line must state its basis.
- Material test certificate (MTC)
- The steel maker's certificate for a plate or tube: its material and test results, identified by certificate, cast and plate number. Under IBR 2026, the material certificates go with a boiler's registration (Form V Part A).
- IBR statutory folder
- The set of documents a boiler maker sends with each boiler for registration under the Indian Boiler Regulations: a covering letter, the forms, the mountings and fittings list, a stage-wise inspection report and copies of the material test certificates, filed in a fixed order.
- RA bill (running account bill)
- An interim bill a contractor raises during the work in India, for the quantity measured so far less what earlier bills already claimed, with deductions such as security deposit, advances recovered and tax deducted at source shown on the bill.
- Retainage
- A share of each progress payment, often 5–10% in US contracts, that the owner holds back until the work is complete, to secure completion and corrections; called retention or security deposit in India.
- Measurement book (MB)
- The register in which work done on an Indian contract is measured and recorded, item by item against the BOQ, and checked by the engineer in charge; the basis for every running account bill.
- Lien waiver
- A signed release in which a contractor, subcontractor or supplier gives up its right to file a mechanics lien for the amount paid; conditional waivers take effect only once the payment clears, unconditional ones at signing.
- Pay application
- A US contractor's periodic request for payment, usually on AIA forms G702 and G703: the value of work completed and materials stored to date, less retainage and earlier payments, certified by the architect.
- Schedule of values
- The breakdown of a contract sum into lines of work, each with its scheduled value, against which every pay application reports the percentage complete; it becomes the G703 continuation sheet.
- Change order
- A signed amendment to a construction contract that changes its scope, price or time; the US term for what Indian contracts call a variation order.
- Over and under billing
- The gap between what a contractor has billed on a job and what it has earned by percentage of completion: billing ahead of progress is over billing (a liability), behind it is under billing (an asset).
- Cost plus
- A way of pricing product: the seller buys at cost and charges the client that cost plus an agreed percentage, the markup.
- CFA (cutting for approval)
- A small piece cut from the actual dye lot of a fabric a designer has ordered, sent for approval before the vendor ships or uses it.
Manufacturing and the shop floor
- Routing
- The ordered list of operations that makes a part (for example cut, bend, weld, inspect), with the machine or work center, setup time and run time for each.
- Bill of materials (BOM)
- The list of components and raw materials, with quantities, needed to make one unit of a part or assembly. A multi-level BOM includes subassemblies that have their own BOMs.
- Work order
- The instruction to make a quantity of a part by a date, carrying its routing and materials. In a job shop it is usually the job itself; printed, it is the traveler.
- Job traveler
- The document that moves with a job through the shop, listing each operation in order, where operators sign off, record time and note quantities and scrap. Increasingly a barcode or screen rather than paper.
- Work in progress (WIP)
- Material and labor already put into jobs that aren't finished yet: no longer raw stock, not yet a finished part.
- Finite capacity scheduling
- Scheduling that only books a machine for the hours it is actually available, so when it is full the next job waits and its later operations move with it.
- Job costing
- Collecting the actual cost of each job (material, labor, machine time, outside work, scrap and rework) and comparing it with what was quoted.
- OEE (overall equipment effectiveness)
- A measure of how much of a machine's planned time produces good parts: availability × performance × quality.
- RFQ (request for quote)
- A request for a price and lead time on a defined part or quantity. A manufacturer receives RFQs from customers and sends them to suppliers; the two are different workflows.
- MRP (material requirements planning)
- Working out what material to buy or make, how much and when, from orders, bills of materials, stock on hand and lead times.
Boilers and pressure vessels (ASME)
- MAWP (maximum allowable working pressure)
- The highest gauge pressure a finished boiler or pressure vessel may run at, measured at its top, at a stated temperature, worked out from the thicknesses actually used less corrosion. The relief device is set at or below it.
- MDMT (minimum design metal temperature)
- The coldest metal temperature at which a pressure vessel may be at its full pressure. It decides whether the steel, welds and heat-affected zones must be impact tested to prove they won't fracture when cold.
- WPS (welding procedure specification)
- The written welding instructions a welder follows: process, materials, filler metal, position, preheat, heat treatment and electrical settings, each given as a range supported by a qualified procedure test (the PQR).
- PQR (procedure qualification record)
- The record of a test weld made to qualify a welding procedure: the materials and settings actually used and the results of its tension, bend and any impact tests. Every WPS must be supported by one or more PQRs.
- WPQ (welder performance qualification)
- The record that a welder passed their own qualification test under ASME Section IX, and what it covers: process, positions, thicknesses, diameters and filler F-number.
- Welder continuity
- The rule (ASME Section IX, QW-322) that a welder's qualification for a process lapses after six months without welding with it. Shops keep a log of each welder's last weld per process to show continuity.
- P-number
- ASME Section IX's grouping of base metals with similar welding behaviour, so one procedure or welder test covers every material in the group: P-No. 1 for carbon steel, P-No. 8 for austenitic stainless.
- Joint efficiency
- The factor (E) applied to a welded joint in ASME pressure vessel thickness formulas, set by the joint type and how much it is radiographed: 1.0, 0.85 or 0.70 for a double-welded butt joint with full, spot or no radiography.
- Hydrostatic test
- The pressure test of a finished boiler or vessel filled with water, held above its MAWP and inspected for leaks: at least 1.3 × MAWP (times a stress ratio) for an ASME Section VIII Division 1 vessel, 1.5 × MAWP for a Section I boiler.
- Heat number
- The number a steel mill gives to one melt (heat) of steel, marked on the material and printed on its test certificate. It is the link between a piece of plate or pipe and the certificate that proves what it is.
- ASME Certification Mark (stamp)
- The mark a holder of an ASME certificate stamps on a boiler, pressure vessel or relief device, with a designator for what it is built to: U for Section VIII Division 1 vessels, S for power boilers, UV for relief valves.
- Manufacturer's Data Report
- The ASME form that records a stamped boiler or vessel as built, such as U-1A or P-2: design conditions, materials, thicknesses, joints, examination and test pressure, signed by the manufacturer and the Authorized Inspector.
- NBIC (National Board Inspection Code)
- The National Board's code for boilers and pressure vessels after they're built: installation, inservice inspection, repairs and alterations, and pressure relief devices. Repairs under it are done by holders of the R stamp.
- Hold point
- A step on an inspection and test plan that work may not pass until a named party (shop QC, the Authorized Inspector or the customer's inspector) has inspected it and released it. A witness point needs only notice; a hold point stops the job.
- Nonconformance report (NCR)
- The record of anything that fails a requirement (the Code, a drawing, a purchase order), from discovery through disposition, repair, re-inspection and close. It holds the item and the steps that depend on it until it is closed.
- Manufacturer's data book (MDB)
- The bound set of quality records shipped with a pressure vessel, heat exchanger or boiler: the data report, drawings, MTRs, weld map, welding qualifications, NDE, heat treatment and test records, NCRs and the signed ITP.
Talk to us about your systems.
Tell us what's held together with workarounds right now. We reply to every message ourselves.