Hardness testing and PMI on pressure vessels
Mostly when the purchaser's specification asks for it, not the ASME Code: hardness limits on welds and heat affected zones for sour, caustic or hydrogen service, and positive material identification (PMI) of alloy parts and welds so the wrong alloy never goes in. The shop records each reading with its location, unit and limit, and a reading over the limit is a nonconformance.
Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

Video chapters (10)
- 0:00Hardness Testing & PMI Overview: Code vs. Purchaser Specs
- 0:22Sour/Caustic Limits (22 HRC / 200 HB) & Post-PWHT Weld/HAZ Zones
- 0:464 Hardness Scales Compared: Brinell, Vickers, Rockwell & Leeb/UCI
- 1:05Reference Block Calibration, Polishing & Agreeing on a Referee Method
- 1:28Worked Failure: Weld L1 Right HAZ at 207 HBW Opens NCR-041
- 1:48Positive Material Identification (PMI): Portable XRF/OES & API RP 578
- 2:08Official Citations: NACE MR0175 / ISO 15156, API RP 578 & BPVC 2025
- 2:30Enforcing Numeric 200 HBW Auto-Fail & PMI Logs in Boiler ERP
- 2:482025 Edition Notice & Authorized Inspector Verification
- 3:00Next Steps: Pressure Vessel Data Book (S42), PWHT (S32) & NCRs (S40)
Does the ASME Code require hardness testing?
Generally not for ordinary carbon steel vessels in Section VIII Division 1. Hardness limits come from the purchaser's specification or the service: sour service (wet H2S), caustic, amine and hydrogen service, and many refinery and chemical company standards. Some Code rules for particular materials and procedures do involve hardness, and a welding procedure qualified with hardness requirements carries them; check your edition and the job specification. Where the job's inspection and test plan lists a hardness test, it is a contract requirement like any other.
Why are hardness limits set?
Hard, brittle zones in welds and heat affected zones crack in certain services. The best-known limit is for sour service: NACE MR0175/ISO 15156 limits carbon steel to 22 HRC (about 250 HV), and refinery specifications often set 200 HB or similar on welds of carbon steel in wet H2S or caustic service. Post-weld heat treatment is the usual way to bring a weld under the limit, which is why the hardness check normally comes after PWHT.
Which hardness scales are used?
| Scale | How it is measured | Where it is used |
|---|---|---|
| Brinell (HB, HBW) | A ball pressed into the surface; portable versions on site | Production welds and base metal |
| Vickers (HV) | A diamond pyramid; laboratory, small loads | Procedure qualification hardness traverses |
| Rockwell (HRC, HRB) | Depth of indentation | Specifications such as NACE; bolting |
| Portable (Leeb, UCI) | Rebound or ultrasonic, converted to a scale | Field checks; conversions need care |
Record the scale and the method with every reading: a number without its unit can't be accepted or rejected, and conversions between scales are approximate. Customer specifications are sometimes written in an unusual unit; confirm the scale and the test method before work starts rather than at final inspection.
Where are hardness readings taken?
Where the specification says: typically weld metal, heat affected zone and base metal on each side, on each weld or a sample of welds by type and welder, after PWHT. The record should identify the weld (by its weld map number), the location on it, the reading, the scale, the instrument and its calibration, and the limit it was compared with.
What is PMI and when is it required?
Positive material identification (PMI) checks that an alloy part or weld is the alloy it is supposed to be, by portable X-ray fluorescence (XRF) or optical emission spectroscopy (OES). It catches the stainless fitting that is really 304 instead of 316, or the chrome-moly weld made with carbon steel filler. ASME doesn't require it for ordinary construction; refinery and petrochemical purchasers usually do for alloy pressure parts, often following API RP 578. The MTR says what the mill certified; PMI checks the piece in your shop.
A typical PMI scope: every alloy pressure part, a sample or all of the alloy welds, and every alloy bolt; each result recorded against the part's heat number and the weld map, with the instrument and its check standard.
What happens when a reading fails?
It becomes a nonconformance report: the weld or part is held, the cause found (no PWHT, wrong filler, wrong material), the disposition decided (re-PWHT, repair, replace), and the area retested. The failed reading stays on the record next to the retest.
Can you show a hardness record?
A record for one weld, after PWHT (made-up readings, limit 200 HB maximum):
| Weld | Location | Reading | Scale | Instrument | Result |
|---|---|---|---|---|---|
| L1 | Weld metal, 12 o'clock | 178 | HBW (portable) | Unit 2, verified 3 March | Pass |
| L1 | HAZ, left | 186 | HBW | Unit 2 | Pass |
| L1 | HAZ, right | 207 | HBW | Unit 2 | Fail, NCR 041 |
| L1 | Base metal, left | 152 | HBW | Unit 2 | Pass |
The failed reading leads to an NCR; after re-PWHT the retest is a new row, and the failed row stays.
How are portable hardness testers checked?
Against a certified reference block before use, at the hardness range being tested, with the result recorded on the day's sheet. Portable readings depend on surface preparation, so grind and polish the spot as the instrument's method requires; a rough surface reads low or scatters. When results are close to the limit, take more readings or confirm with a different method, and agree with the purchaser in advance which method decides.
How should results be recorded?
As numbers, not ticks. Each reading with its location, scale, instrument and limit, so the pass or fail is worked out from the limit rather than typed in. Our US boiler demo does this with acceptance rules: a hardness limit is entered once with its source (for example 200 HBW maximum), and an inspection value above it is failed automatically and offers an NCR. See ERP for boiler and pressure vessel shops. PMI is recorded as an inspection with its result; the demo doesn't read analyser files.
WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.
A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.
A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.
Official sources
- Boiler and Pressure Vessel Certification. ASME, November 1, 2026.
- 2025 ASME Boiler and Pressure Vessel Code (Section VIII, Division 1). ASME, July 1, 2025.
- API RP 578, Guidelines for a Material Verification Program (MVP) for New and Existing Assets. American Petroleum Institute, November 14, 2026.
- ISO 15156-1:2020 (NACE MR0175), materials for use in H2S-containing environments, Part 1; hardness limits for carbon steels are in Part 2. ISO, November 14, 2026.
What this page is not
A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .
Talk to us about your systems.
Tell us what's held together with workarounds right now. We reply to every message ourselves.