Software for architecture firms in India: stages, fees and GST

An architecture practice in India bills its fee in stages (concept, design, approval drawings, working drawings, tender, site supervision) and has to track hours per project, consultants' fees, GST on its invoices, TDS deducted by clients, and drawings issued with their revisions. Software for a practice should bill each stage as it is reached, show fee received against hours spent, and keep the drawing register with the project.

Pujan Motiwala · Statutory rules checked against the official texts on

A rolled building drawing, a stack of invoices and a calculator on a desk: stage-wise fee billing in an architecture practice.

How do architecture practices in India bill their fees?

Mostly as a percentage of the project cost or a lump sum, released in stages. A common pattern:

StageWhat is delivered
AppointmentRetainer on signing
Concept designSite study, concept options, client brief signed off
Preliminary designPlans, sections, elevations, outline specifications
Approval drawingsDrawings for the local authority, submitted
Working drawings and tenderConstruction drawings, specifications, BOQ, tender documents
Site supervisionPeriodic visits, clarifications, certifying contractor bills
CompletionCompletion drawings, occupancy support

The share at each stage is agreed in the appointment letter. The Council of Architecture registers architects under the Architects Act, 1972 and sets professional conduct rules; check its current guidance on fees and agreements.

What taxes apply to an architect's invoice?

GST on architectural services, charged on each invoice at the applicable rate, with the practice's GSTIN, the client's GSTIN for business clients, and the SAC code for the service. Business clients usually deduct TDS on professional fees, which the practice claims against its income tax, so each invoice should be matched to the TDS credit shown in the practice's tax statement. Your CA confirms rates and sections for your case.

What else does a practice need to track?

  • Hours per project and stage, to see which projects earn their fee.
  • Consultants: structural, MEP and landscape fees, paid by the practice or by the client.
  • Drawings: a register of every drawing issued, to whom, with its revision and date, so site works from the current set.
  • BOQs and tender documents for the working drawing stage; see what is a BOQ and the interior quotation format.
  • Contractor bills certified during site supervision, with the measurement and the amount certified.

Can you show a stage-wise fee schedule?

An example for a ₹12 lakh fee on a building project (shares and figures are made up; set yours in the appointment letter):

StageShareFee (₹)GST at the applicable rateInvoice when
Appointment retainer10%1,20,000Added on the invoiceSigning
Concept design10%1,20,000AddedConcept approved
Preliminary design15%1,80,000AddedDesign frozen
Approval drawings15%1,80,000AddedSubmitted to the authority
Working drawings and tender30%3,60,000AddedIssued for construction
Site supervision15%1,80,000AddedSpread over construction months
Completion5%60,000AddedCompletion drawings handed over
Total100%12,00,000

Each invoice then carries GST, and the client deducts TDS on payment; match each receipt to the invoice and the TDS credit.

How do you know if a project is earning its fee?

Compare the fee earned to date with the cost of the hours spent: if a project has earned 40% of its fee and used 70% of the hours budgeted for the whole job, it will lose money unless the remaining stages go unusually well. Ask staff to record hours by project and stage weekly; a month later, nobody remembers.

Can Tally do this?

Tally handles the books, GST and TDS. It doesn't hold stages, hours, drawings or project margins; those usually live in spreadsheets beside it. A practice system keeps them by project and posts invoices to Tally, so the books stay in Tally and the project picture in one place.

What should an architecture practice ask a software vendor?

Show me: a fee set up by stages and invoiced as each is reached; hours entered against a project and stage, and fee earned per hour by project; a drawing register with revisions; consultants' fees on the project; and invoices posting to Tally with GST. For firms that also execute interiors, the same system should carry quotations, purchase orders and site work. See ERP for interior design firms and software for interior design firms.

Answer five questions about your business and get the requirements that apply to it, ready to send to vendors.

Free. Runs in your browser; nothing is sent anywhere.

Most lines here can be tried today on a live system: manufacturing · trading · interiors · how Ahrom Labs builds them

Official sources

What this page is not

A guide written by Ahrom Labs from the systems it runs; not legal or tax advice. Statutory lines quote the official text, and the text governs wherever this page differs from it; how a rule applies to your business is a question for your CA. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.