Economisers under IBR 2026: Forms XV, XVI, tests, mountings
An economiser is a part of the feed pipe heated by flue gas, so it comes under the Boilers Act and IBR 2026 Chapter 11 (regulations 357 to 392). It must be built under an Inspecting Authority, and before or with the first application for registration the maker furnishes Form XVI (certificate of manufacture and test) and the Inspecting Authority Form XV (inspection under construction). Assembled sections are tested to at least 1.5 times the maximum allowable working pressure for ten minutes.
Pujan Motiwala · Checked against the Gazette on · IBR 2026, in force from 1 October 2026

What counts as an economiser?
The Boilers Act, 2025 (section 2(h)) defines it as "any part of a feed-pipe that is wholly or partially exposed to the action of flue gases for the purpose of recovery of waste heat". A feed-pipe is under pressure and carries feed water to the boiler, so an economiser sits after the feed pump, at boiler pressure.
Is a water pre-heater an IBR economiser?
The same equipment name can fall on either side. Check where it is piped and what heats it, not what it is called:
| The pre-heater | Under IBR? | What applies | |---|---|---| | Heated by flue gas, after the feed pump, at boiler pressure | Yes, an economiser | Chapter 11 and Forms XVI and XV, as on this page | | Heated by flue gas, before the feed pump or on an open feed tank | Usually not | Built and tested as a non-IBR vessel; keep its own hydraulic test record | | Heated by steam (shell and tube, steam to water), on the feed pipe | Yes, but as a feed heater, not an economiser | Regulation 379: "such vessels shall comply with the requirements of Chapter-12" when welded |
If an existing pre-heater is moved after the pump, it becomes an economiser and needs the full set of certificates below; non-IBR valves and an uninspected build will not pass.
Which certificates does the maker file?
"All economisers shall be constructed under the supervision of an Inspecting Authority and shall be so certified by that authority." Two certificates then go with the registration papers, which "shall be furnished to the chief inspector before or with the first application for registration.":
| Certificate | Who signs | Regulation | |---|---|---| | Form XVI, certificate of manufacture and test | The maker | 358(4)(a) | | Form XV, inspection under construction | The Inspecting Authority | 358(3) | | Material maker's certificate (tensile strength and elongation) | The steel or tube maker | 358(4)(b) |
Form XVI is "A certificate of manufacture and test in Form-XVI signed by the maker or by a responsible representative of the Maker". It records the type, sections and tubes, intended working pressure, heating surface, the materials of headers, tubes, valve chests and bolts with their makers, and the thickness and tensile results.
Without a certificate the economiser can still be registered, at a lower rating: "Where no certificate is produced, the maximum allowable working pressure as found by formula will be reduced by 10%."
The full documentation checklist
What a complete economiser file holds before it goes to the Chief Inspector:
- Form XVI, signed by the maker, with the maker's drawing (section and end view, principal parts dimensioned).
- Form XV, signed by the Inspecting Authority, countersigning Form XVI.
- Material makers' certificates for plates, headers and bolts, with tensile strength and elongation.
- Tube certificates: Form IV Part C, "signed by the maker and the Inspecting Authority", or the certificate of a well-known tube maker.
- Pipe certificates for headers made of pipe and for the connecting pipes: Form IV Part B.
- Valve and mounting certificates (relief valve, stop and non-return valves, gauges): Form IV Part D.
- The hydraulic test record: pressure, holding time and date for the components and the assembled sections, witnessed by the Competent Person.
What is the hydraulic test?
Components are tested before assembly at the pressures in regulation 361's Table 11/1 (pressures in kg/cm² gauge; MAWP is the maximum allowable working pressure):
| Component | MAWP | Test pressure | |---|---|---| | Cast iron tubes, headers and bends | Any | Twice the MAWP, at least 49 | | Steel tubes and bends | 35 or less | 70 | | Steel tubes and bends | Above 35, up to 70 | Twice the MAWP | | Steel tubes and bends | Above 70 | MAWP plus 70 | | Headers | Below 70 | Twice the MAWP | | Headers | Above 70 | MAWP plus 70 |
Then: "For all assembled sections, the hydraulic test pressure shall not be less than 1.5 times of the maximum allowable working pressure." and "The above test pressure shall be held for a minimum period of ten minutes."
Two rules that are easy to miss. The working pressure is tied to the relief valve: "Maximum allowable working pressure shall be the highest pressure at which the economiser relief valves are to be set." And the design must keep the water from boiling inside: "the maximum outlet water temperature of the economiser shall be at least 22°C below the saturated steam temperature in the boiler drum" (regulation 369).
Which mountings must it have?
Regulation 376 lists them:
- Thermometers at the inlet and outlet: "All economisers shall be provided with thermometers for measuring water temperature adjacent to the inlet and outlet connections."
- A relief valve sized on the economiser's thermal capacity. "Relief valves shall have a minimum orifice diameter of 19 mm."
- A pressure gauge, air release valves where air can collect, and blow-off drain valves.
- A non-return valve in the hot-water return line where feed is mixed with outlet water.
- A by-pass flue for the flue gas, where the economiser is not integral with the boiler, and explosion doors.
- A second way to feed the boiler: "Alternative means of feeding the boiler other than through the economiser shall be provided."
Common mistakes that hold up registration
- Non-IBR valves on a pressure-side pre-heater. A relief or non-return valve bought as non-IBR has no Form IV Part D certificate, so the file is incomplete.
- Assembled sections tested below 1.5 times the working pressure, or held for less than ten minutes.
- No alternative feed line, or no by-pass flue, so the boiler can't run with the economiser isolated.
- Relief valve set above the working pressure on Form XVI. The working pressure is, by regulation 361(3), the relief valve's set pressure.
- Tubes without their own certificate. The steel maker's certificate for the plate doesn't cover the tubes.
- Built first, inspected later. Form XV certifies supervision during construction; it can't be issued for an economiser the Inspecting Authority didn't see being built.
What changed from IBR 1950?
The requirements are carried over from Chapter XI of IBR 1950 to Chapter 11 of IBR 2026 (regulations 357 to 392). The form numbers changed:
| Form | IBR 1950 | IBR 2026 | |---|---|---| | Maker's certificate of manufacture and test | Form VIII | Form XVI | | Inspecting Authority's certificate of inspection under construction | Form VII | Form XV | | Provisional order | Form X | Form XVII | | Memorandum of inspection or registration book | Form IX | Form XVIII |
IBR 2026 replaced IBR 1950 "except as respects things done or omitted to be done before such supersession", so certificates already issued stay as they are; new ones are made on the 2026 forms. The Gazette has no separate transition rule for an economiser that was half built on 1 October 2026: ask the Inspecting Authority which forms it wants. See the IBR 2026 forms list for every renumbered form.
What happens after registration?
The Inspector issues a provisional order in Form XVII and keeps the economiser's inspection and registration book in Form XVIII. These are the Inspector's forms, not the maker's.
How does a boiler manufacturer keep this in order?
The economiser is usually a subsystem of the boiler order. If its bill of materials, test certificates and hydraulic test are already recorded per project, Form XVI can be filled from them instead of typed again: the material and thickness tables come from the linked certificates, and a test below 1.5 times the working pressure, or a missing thermometer or relief valve, shows up before the folder goes to the Inspecting Authority.
Quoted from the regulations (15)
““economiser” means any part of a feed-pipe that is wholly or partially exposed to the action of flue gases for the purpose of recovery of waste heat;”
Boilers Act, 2025, section 2(h)
“All economisers shall be constructed under the supervision of an Inspecting Authority and shall be so certified by that authority.”
IBR 2026, regulation 358(2)
“shall be furnished to the chief inspector before or with the first application for registration.”
IBR 2026, regulation 358(3)
“A certificate of manufacture and test in Form-XVI signed by the maker or by a responsible representative of the Maker”
IBR 2026, regulation 358(4)(a)
“Where no certificate is produced, the maximum allowable working pressure as found by formula will be reduced by 10%.”
IBR 2026, regulation 359
“For all assembled sections, the hydraulic test pressure shall not be less than 1.5 times of the maximum allowable working pressure.”
IBR 2026, regulation 361(2)
“The above test pressure shall be held for a minimum period of ten minutes.”
IBR 2026, regulation 361(4)
“All economisers shall be provided with thermometers for measuring water temperature adjacent to the inlet and outlet connections.”
IBR 2026, regulation 376(1)
“Relief valves shall have a minimum orifice diameter of 19 mm.”
IBR 2026, regulation 376(2)(a)
“Alternative means of feeding the boiler other than through the economiser shall be provided.”
IBR 2026, regulation 376(10)
“except as respects things done or omitted to be done before such supersession”
IBR 2026, preamble
“Maximum allowable working pressure shall be the highest pressure at which the economiser relief valves are to be set.”
IBR 2026, regulation 361(3)
“the maximum outlet water temperature of the economiser shall be at least 22°C below the saturated steam temperature in the boiler drum”
IBR 2026, regulation 369
“such vessels shall comply with the requirements of Chapter-12”
IBR 2026, regulation 379(1)(a)
“A certificate of manufacture and test in Form-IV(Part-C), signed by the maker and the Inspecting Authority shall be furnished”
IBR 2026, regulation 11
See a boiler's IBR folder produced from its material certificates, with a sample company.
Built for a boiler manufacturer: ERP for boiler manufacturers · how the folder is produced · other rules an ERP must meet
Official sources
- Indian Boiler Regulations, 2026 (Gazette of India, Extraordinary, No. 596). Central Boilers Board, Department for Promotion of Industry and Internal Trade, October 1, 2026.
- The Boilers Act, 2025 (No. 12 of 2025), section 2. Ministry of Law and Justice, Gazette of India, Extraordinary, Part II—Section 1, April 4, 2025.
What this page is not
A guide written by Ahrom Labs from the Gazette text; not legal advice. The Gazette governs wherever this page differs from it, and a state's Chief Inspector of Boilers may set procedures of their own. Last updated .