Form IV Part B: Certificate of manufacture and test for pipes
The certificate of manufacture and test for steam and feed pipes.
Pujan Motiwala · Checked against the Gazette on · IBR 2026, in force from 1 October 2026
What is Form IV Part B?
Form IV Part B of the Indian Boiler Regulations, 2026 is the certificate of manufacture and test for pipes, prescribed under regulation 10. Under the Indian Boiler Regulations, 1950 it was Form III-A (certificate of manufacture and test for pipes).
Who issues and signs Form IV Part B?
The pipe maker and the Inspecting Authority. Well-known pipe makers may issue it online with a digital signature.
What does Form IV Part B record?
- The part and quantity, drawing number, maker and customer
- The steel: process of manufacture, fully killed or rimmed, chemical composition, heat number, size, test certificate number and date, steel maker
- The pipe: process of manufacture, main dimensions, tolerances, specification
- Tests: bend test on pipe or weld, flattening, tensile strength, chemical composition, heat treatment, hydraulic test in kg/cm² (g)
- The identification mark of the Inspecting Authority or well-known pipe maker
When is Form IV Part B filed, and with what?
Kept with the boiler's records by the Inspecting Authority, the owner and the manufacturer (regulation 308).
What changed for Form IV Part B from IBR 1950?
Under IBR 1950 this was Form III-A, which is the name many folders still use.
Related forms
- Form IV Part A: Constructor's certificate of manufacture and test (was Form III)
- Form IV Part C: Certificate of manufacture and test for tubes (was Form III-B)
- Form IV Part D: Certificate of manufacture and test of boiler mountings and fittings (was Form III-C)
- Form IV Part E: Certificate of manufacture and test of castings (was Form III-F)
- Form IV Part F: Certificate of manufacture and test of forgings (was Form III-G)
- Form IV Part G: Certificate of manufacture and test for headers, desuperheaters/attemperators, blowdown tanks, feed water tanks, accumulators and deaerators (was Form III-H)
- Form IV Part H: Certificate of manufacture and test for dished ends and end covers (was Form III-I)
- Form XXII: Certificate of manufacture and test for small industrial boilers (was Form XVII)
- Form XXIII: Certificate of manufacture and test for small solar boilers (was Form XVII)
Quoted from the regulations (2)
“A certificate of manufacture and test in Form-IV(Part-B) signed by the maker and the Inspecting Authority shall be furnished and well-known pipe makers may also furnish digitally signed”
IBR 2026, regulation 10
“Identification mark of Inspecting Authority/Well known pipe maker”
IBR 2026, Form IV Part B
See a boiler's IBR folder produced from its material certificates, with a sample company.
Built for a boiler manufacturer: ERP for boiler manufacturers · how the folder is produced
Official sources
- Indian Boiler Regulations, 2026 (Gazette of India, Extraordinary, No. 596). Central Boilers Board, Department for Promotion of Industry and Internal Trade, October 1, 2026.
What this page is not
A guide written by Ahrom Labs from the Gazette text; not legal advice. The Gazette governs wherever this page differs from it, and a state's Chief Inspector of Boilers may set procedures of their own. Last updated .
Talk to us about your systems.
Tell us what's held together with workarounds right now. We reply to every message ourselves.