Form II: Qualified boiler welder's certificate

The certificate a welder must hold to weld boilers, boiler components, economisers, feed pipes, steam pipes and superheaters (regulation 7(1)(b)(iii)).

Pujan Motiwala · Checked against the Gazette on · IBR 2026, in force from 1 October 2026

What is Form II?

Form II of the Indian Boiler Regulations, 2026 is the qualified boiler welder's certificate, prescribed under regulation 7(1)(b)(iii) and 541. Under the Indian Boiler Regulations, 1950 it was Form XIII (qualified boiler welder's certificate).

Download Form II as a PDF: the form as notified, cut from the Gazette of India (No. 596, 1 October 2026) with nothing changed.

Who issues and signs Form II?

The Competent Authority, after the welder passes the qualification test under regulation 541.

What does Form II record?

  • Certificate number, the welder's photo, name, date of birth, identification marks, signature and address
  • Employment particulars
  • Qualification details: date of test, type and position, material type and grouping (M and group number), process, backing, electrode grouping (U number) or filler wire, whether the test piece was X-rayed
  • Period of validity and the basis of each renewal (continuous engagement or fresh tests)

When is Form II filed, and with what?

Held by the welder; the employer keeps a copy, and the Inspecting Authority checks it before welding on IBR work.

What changed for Form II from IBR 1950?

Under IBR 1950 the welder's certificate was Form XIII; it is now Form II. Continuity is proved on Form XX, and the test itself is recorded on Form XXI.

  • Form XX: Qualified boiler welder's certification continuity form
  • Form XXI: Record of welder's qualification and requalification tests (was Form XII)
Quoted from the regulations (2)

“shall possess certificate in Form-II”

IBR 2026, regulation 7(1)(b)(iii)

“has been examined and tested in the prescribed manner”

IBR 2026, Form II

One email when the regulation or a form changes. No newsletter; reply “stop” any time.

See a boiler's IBR folder produced from its material certificates, with a sample company.

Free. Resets every night.

Built for a boiler manufacturer: ERP for boiler manufacturers · how the folder is produced · other rules an ERP must meet

Official sources

What this page is not

A guide written by Ahrom Labs from the Gazette text; not legal advice. The Gazette governs wherever this page differs from it, and a state's Chief Inspector of Boilers may set procedures of their own. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.