Form IX: Details to be furnished with an application for inspection of a boiler after twelve or thirty-six months of certification

The details furnished with an application to inspect a boiler used for electric power generation (Appendix H) or a waste heat boiler in a continuous process plant (Appendix I), twelve or thirty-six months after certification.

Pujan Motiwala · Checked against the Gazette on · IBR 2026, in force from 1 October 2026

What is Form IX?

Form IX of the Indian Boiler Regulations, 2026 is the details to be furnished with an application for inspection of a boiler after twelve or thirty-six months of certification, prescribed under regulation 295(7) and 295(8). Under the Indian Boiler Regulations, 1950 it was Form XIX (details to be furnished with an application for inspection of a boiler after twelve/twenty-four months of certification).

Download Form IX as a PDF: the form as notified, cut from the Gazette of India (No. 596, 1 October 2026) with nothing changed.

Who issues and signs Form IX?

The boiler owner.

What does Form IX record?

  • Owner, registry number, pressure and temperature, steam generation, heating surface, year of make and construction
  • Past exemptions, last annual inspection, expiry of the current certificate and its pressure
  • Past repairs year by year and remarks on the last certificate
  • Feed water quality, feed pumps, safety valves, soot blowers, water level alarms, stop, check and blowdown valves
  • Calibration dates of the master pressure gauge and temperature instruments; protection device tests
  • Stoppages in the last twelve months, leaks, present operating pressure, water testing and cleaning intervals

When is Form IX filed, and with what?

The Chief Inspector, with the application for inspection after twelve or thirty-six months of certification (regulation 295).

What changed for Form IX from IBR 1950?

New in IBR 2026, with the longer inspection intervals of regulations 295 and 311.

  • Form XIII: Questionnaire for repairers of boilers, economisers, steam lines and feed water lines (was Form XVIII)
Quoted from the regulations (2)

“DETAILS TO BE FURNISHED ALONGWITH APPLICATION FOR INSPECTION OF BOILER AFTER TWELVE/THIRTY SIX MONTHS OF THE CERTIFICATION UNDER REGULATION 311”

IBR 2026, regulation 295

“Details of past repairs (year-wise)”

IBR 2026, Form IX

One email when the regulation or a form changes. No newsletter; reply “stop” any time.

See a boiler's IBR folder produced from its material certificates, with a sample company.

Free. Resets every night.

Built for a boiler manufacturer: ERP for boiler manufacturers · how the folder is produced · other rules an ERP must meet

Official sources

What this page is not

A guide written by Ahrom Labs from the Gazette text; not legal advice. The Gazette governs wherever this page differs from it, and a state's Chief Inspector of Boilers may set procedures of their own. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.