OEE (overall equipment effectiveness)
A measure of how much of a machine's planned time produces good parts: availability × performance × quality.
Pujan Motiwala · · Updated
- Availability: run time ÷ planned production time (stops and breakdowns count against it).
- Performance: (ideal cycle time × total parts) ÷ run time (slow cycles count against it).
- Quality: good parts ÷ total parts (scrap and rework count against it).
Example: a machine planned for 8 hours runs 6.4 (availability 80%), makes 300 parts at an ideal 1 minute each in those 6.4 hours, 384 minutes (performance 300 ÷ 384 = 78.1%), and 285 are good (quality 95%). OEE = 0.80 × 0.781 × 0.95 = 59.4%.
The number alone doesn't say what to fix; the three factors do. Collecting them needs stops, counts and scrap recorded at the machine, the same shop-floor data scheduling and job costing depend on.
Talk to us about your systems.
Tell us what's held together with workarounds right now. We reply to every message ourselves.