MAWP, design pressure, operating pressure and MDMT

Design pressure is the pressure a vessel is designed for, set from the process with a margin. MAWP (maximum allowable working pressure) is the highest pressure the finished vessel can take at its top, at the design temperature, worked out from the thicknesses actually used, so it is at least the design pressure. Operating pressure sits below both, and the relief device is normally set at or below MAWP.

Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

A pressure gauge with a red marker line on top of a vessel head: maximum allowable working pressure.
Video chapters (10)
  1. 0:00Design Pressure vs. MAWP vs. Operating Pressure Overview
  2. 0:21Pressure Ladder: Operating → Design (UG-21) → As-Built MAWP (UG-98)
  3. 0:42Worked Shell MAWP: 175.1 psi vs. 168.1 psi After UG-16(c) Tolerance
  4. 1:02Top Datum, Liquid Static Head (+8.7 psi / 20 ft) & "New and Cold"
  5. 1:24Design Margin, Section XIII Relief Set Pressure & UG-150 (10/16/21%)
  6. 1:44MDMT at MAWP, UCS-66 Impact Testing & Nameplate Requirements
  7. 2:04Official ASME Div. 1, Section XIII & Section II Part D Citations
  8. 2:26Linking UG-27 / PG-27 Calcs, Hydro Tests & MDMT in Boiler ERP
  9. 2:462025 Edition Notice & Authorized Inspector Verification
  10. 3:00Next Steps: Impact Testing (S31), Hydro Test (S02) & Shell Calcs (S03)

What is the difference between MAWP and design pressure?

Design pressure is what the vessel is designed for; MAWP is what the finished vessel can actually take. The owner or designer sets the design pressure, with its coincident temperature, from the process (UG-21 in Section VIII Division 1, 2025 Edition). MAWP is calculated afterwards from the thicknesses actually used, less corrosion allowance, for every part, and the weakest part sets it (UG-98 and Mandatory Appendix 3). It is therefore at least the design pressure. The Code text is ASME's and paid; this guide cites paragraphs and works examples.

PressureWhat it isWho sets it
Operating pressureWhat the process normally runs atThe process
Relief set pressureWhere the relief device opens; normally at or below MAWPThe designer, within Code limits
Design pressureWhat the vessel is designed for, at the top, with the coincident temperatureThe owner or designer (UG-21)
MAWPThe most the completed vessel can take at the top, at the design temperature, from its actual thicknessesCalculated (UG-98)

How do you calculate MAWP from a plate thickness?

Rearrange the thickness formula for pressure, using the corroded thickness and radius. For a cylindrical shell under UG-27(c)(1), MAWP = SEt / (R + 0.6t). Worked example, the same shell as the shell thickness guide: ⅜ in plate, corrosion allowance 0.125 in, inside radius 24 in, S = 20,000 psi, E = 0.85.

  1. Corroded thickness t = 0.375 − 0.125 = 0.250 in; corroded radius R = 24 + 0.125 = 24.125 in.
  2. Hoop stress: MAWP = 20,000 × 0.85 × 0.25 / (24.125 + 0.6 × 0.25) = 4,250 / 24.275 = 175.1 psi.
  3. Longitudinal stress (UG-27(c)(2)): 2SEt / (R − 0.4t) = 8,500 / 24.025 = 353.8 psi, so the hoop case governs.
  4. If the plate may arrive 0.01 in thin (the under-tolerance UG-16(c) allows for plate), t = 0.240 in and MAWP = 4,080 / 24.269 = 168.1 psi.

The shell calculator on that page does the same, taking the lower of the two cases. The heads, nozzles and flanges have their own MAWPs, and the vessel's MAWP is the lowest of all of them.

Can MAWP be higher than design pressure?

Yes. Plate comes in standard thicknesses, so the shell above, designed for 150 psi, can take 168 psi as built. Many owners still stamp MAWP equal to the design pressure to keep the relief valve and the nameplate simple; that is allowed. A higher MAWP leaves room for a later rerate.

Where is MAWP measured?

At the top of the vessel in its normal operating position, at the stated temperature. Parts lower down also see the static head of the liquid and are designed for it: 20 ft of water adds 20 × 0.433 = 8.7 psi, so with an MAWP of 150 psi at the top the bottom course is checked for 158.7 psi.

Does MAWP use new or corroded thickness?

Corroded: the thickness left at the end of the corrosion allowance, at the design temperature, where the allowable stress from Section II Part D is lowest. Some owners also ask for a "new and cold" pressure, which is higher; it is an owner's term, not a Division 1 one. The hydrostatic test is set from MAWP.

What design pressure margin should I use?

A common practice is design pressure about 10% above the maximum operating pressure, or 25 psi (1.7 bar) above it at low pressures, so normal swings don't lift the relief valve. That margin is practice, not a Code rule: the Code only requires that the vessel is protected and the relief device set within its limits.

Where should the relief valve be set?

Normally at or below MAWP for a single device. Division 1's overpressure protection rules (the UG-150 series since the 2021 Edition) say when a vessel needs protection and how much pressure may rise while it relieves; the device itself is built to Section XIII, which ASME describes as setting "requirements for design, materials, inspection, testing, and marking of pressure relief valves, rupture disks, and related devices".

How far can pressure rise above MAWP while a valve relieves?

In Division 1, generally by 10% or 3 psi (whichever is greater) with one device, 16% or 4 psi with several, and 21% for fire exposure. Worked example: MAWP 150 psi, one valve set at 150 psi → pressure may reach 165 psi while relieving; under fire, 181.5 psi. Check the overpressure paragraphs of your 2025 Division 1 for the exact conditions.

What is MDMT?

The minimum design metal temperature: the coldest the metal may be while the vessel is at its MAWP, from a winter start-up, an autorefrigerating flash or a cold fluid. It decides whether materials need impact testing; see MDMT and impact testing. MAWP at its temperature and MDMT at its pressure both go on the nameplate and the data report.

When does a vessel have to be designed to Section VIII at all?

ASME describes Division 1 as providing rules "for pressure vessels operating over 15 psig, fired/unfired"; at 15 psi or less a vessel is outside its scope, though the law where it is installed may still regulate it. See Section VIII and US boiler laws.

What does our software keep for MAWP?

Our US boiler demo keeps each job's calculation sheet (UG-27(c)(1) for vessel shells, PG-27 for boiler shells) and prints MAWP at temperature and MDMT on the job's data report layout in the ASME record package, with the hydro test record set from it. See ERP for boiler and pressure vessel shops.

Quoted from the official text (3)

“ASME BPVC Section VIII Division 1 provides design, fabrication, inspection, testing & certification rules for pressure vessels operating over 15 psig, fired/unfired.”

ASME Section VIII Division 1 product page, description

“BPVC Section XIII sets requirements for design, materials, inspection, testing, and marking of pressure relief valves, rupture disks, and related devices.”

ASME Section XIII product page, description

“provides material properties, allowable stress values, and design data for pressure equipment.”

ASME Section II Part D product page, description

WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.

A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.

A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.

What this page is not

A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.