National Board registration, the NB mark and the R stamp

National Board registration files a stamped boiler's or vessel's data report with the National Board of Boiler and Pressure Vessel Inspectors, which keeps it permanently; the item then carries the NB mark and a National Board number. Many US jurisdictions require it for installation. The National Board also runs the R stamp program for repairs and alterations under its inspection code, the NBIC.

Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

An open card-index drawer with one card raised: the National Board's register of built boilers and vessels.
Video chapters (10)
  1. 0:00National Board Registration, NB Mark & NB-264 Overview
  2. 0:22ASME vs. NBBI: Chief Inspectors, 3-Step Filing & State Mandates (PA, CA)
  3. 0:44NB-264 Authorization ($0 Fee), 30-Day Rule & 2025 EDT Forms
  4. 1:05NBIC 4 Parts & Key 2025 Updates (QMS + Supplements 10 & 11)
  5. 1:26All 4 National Board Accreditation Marks: R, VR, NR & T/O
  6. 1:46R Stamp Fees ($1,150 + $150 Loan) & Forms R-1 to R-4
  7. 2:0613 Official Excerpts Across BPV-GUI-03, NB-264 & NBBI
  8. 2:27Storing National Board Numbers & Linked Audit Packages in Boiler ERP
  9. 2:472025 Edition & Authorized Inspector Verification Notice
  10. 3:00Next Steps: National Board R Stamp (S23) & ASME Data Reports (S15)

What is National Board registration for a pressure vessel?

It is the filing of a stamped item's Manufacturer's Data Report with the National Board of Boiler and Pressure Vessel Inspectors (NBBI), which keeps it as a permanent record; the nameplate then carries the NB mark and a National Board number. The National Board describes registration as "the culmination of a three-step process": construction to the ASME Code, inspection by a National Board commissioned inspector, and the documentation certifying compliance.

Who is the National Board?

The body of the chief boiler inspectors of most US states and Canadian provinces and territories, and many large US cities. ASME writes the construction code; the National Board commissions inspectors, keeps the registry of built items, and writes the code for equipment once it's in service, the National Board Inspection Code (NBIC).

Is National Board registration required?

In many jurisdictions, yes. ASME's handbook warns that registration "may be required by the legal authority of a state or municipality of the United States or province of Canada". Pennsylvania, for example, requires an ASME boiler or unfired pressure vessel to be stamped with "its National Board registration number" (34 Pa. Code §3a.21(b)), and California requires new air tanks to be National Board registered. Check the jurisdiction for the place of installation; see US and Canadian boiler laws.

How does a manufacturer become authorized to register?

By meeting the National Board's criteria in NB-264 and applying online. The National Board says: "There is no charge to become authorized to register, but there is a fee for each item registered." The manufacturer's quality control manual then says how registration numbers are controlled, who submits the forms and how fast.

How soon must a data report be registered?

Within 30 days of certification. NB-264 (Revision 19) says the time between the Inspector's certification and submitting the registration forms "shall not exceed 30 days".

How are data reports filed?

On paper (the original report, in the exact format of the Code's form) or through the National Board's Electronic Data Transfer (EDT) system. Since 1 January 2026 items built to the 2025 Code must be on the 2025 forms; reports on outdated forms are returned. See data reports.

What does the NB mark on a nameplate mean?

That the item's data report is on file with the National Board. In the National Board's words, "The NB mark is used by manufacturers to identify items registered with the National Board." For an owner, it means a lost data report can always be replaced, which matters at every later inspection, repair or sale.

What is the NBIC?

The National Board Inspection Code: the rules for pressure equipment after it is built, in four Parts: Part 1 Installation, Part 2 Inspection, Part 3 Repairs and Alterations, and Part 4 Pressure Relief Devices. The National Board says the NBIC "is adopted into law by most US and Canadian jurisdictions", and it is published every two years; the current edition is 2025.

What changed in the 2025 NBIC?

Among hundreds of revisions, the National Board's summary says "Quality System" became "Quality Management System" throughout, and new supplements were added for classifying repairs and alterations (Supplement 10) and for engineered repairs and alterations (Supplement 11). Check the (25) markers in your copy for the details.

What are the R, VR, NR and T/O stamps?

StampFor
RRepairs and alterations to boilers, pressure vessels and other pressure-retaining items
VRRepair of pressure relief valves
NRRepair and replacement of nuclear components
T/OIn-service testing of pressure relief valves

How does a company get the R stamp, and what does it cost?

In short below; the full process is in the R stamp guide.

By having an inspection agreement with an Authorized Inspection Agency, a written quality system that meets the current NBIC and NB-415, the current NBIC itself and the construction code for its scope, then passing an on-site review, which can be held together with an ASME joint review. The National Board's page gives the certificate fee as $1,150 for three years, plus a one-time $150 for the loan of the steel R stamp for new holders.

Which forms record a repair or alteration?

NBIC Form R-1, Report of Repair (NB-66), and Form R-2, Report of Alteration (NB-229), both available through EDT; R-3 reports parts fabricated by welding and R-4 is a supplementary sheet. For registered items, the R-1 or R-2 is filed with the National Board too.

What does our software keep for registration?

Our US boiler demo records each job's National Board number on its ASME record package and data report layout, with the full record behind it. It doesn't file through EDT; a shop files the official form there or on paper. See ERP for boiler and pressure vessel shops.

Quoted from the official text (13)

“registration of data report forms may be required by the legal authority of a state or municipality of the United States or province of Canada.”

ASME BPV-GUI-03, section 1

“There is no charge to become authorized to register, but there is a fee for each item registered.”

NBBI Data Report Registration

“Registration represents the culmination of a three-step process: the design and construction of an item in accordance with the ASME Code, inspection by an NBBI Commissioned Inspector, and final documentation certifying compliance with the ASME Code.”

NBBI Data Report Registration

“The NB mark is used by manufacturers to identify items registered with the National Board.”

NBBI Data Report Registration, NB Mark

“The timeframe in which registration forms will be submitted to NBBI following certification by the Inspector or CI shall not exceed 30 days.”

NB-264 Revision 19, submitting registration forms

“The National Board members are the chief boiler inspectors representing most U.S. states and provinces/territories of Canada, as well as many major cities in the United States.”

NBBI About Us

“The NBIC is adopted into law by most US and Canadian jurisdictions.”

NBBI NBIC page

““Quality System” has been changed to “Quality Management System” throughout.”

NBBI NBIC 2025 Edition Changes

“NB-66, Report of Repair”

NBBI NBIC Report Forms

“NB-229, Report of Alteration”

NBBI NBIC Report Forms

“The certificate fee for the R Certificate of Authorization is $1150 USD for a three-year period.”

NBBI R Certificate of Authorization, fees

“have a written quality system that complies with the requirements of the current edition of the National Board Inspection Code (NBIC), NB-415, and includes the expected scope of activities;”

NBBI R Certificate of Authorization, new issuances

“A boiler or unfired pressure vessel built to the ASME Code must be stamped with the appropriate ASME symbol, the manufacturer’s information in accordance with stamping requirements of the code of construction, and its National Board registration number.”

34 Pa. Code § 3a.21(b)

WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.

A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.

A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.

Official sources

What this page is not

A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.