Form I Part A: Inspecting Authority's certificate of inspection during construction, boiler made to a foreign code for export

The Inspecting Authority's certificate of inspection during construction for a boiler made to a foreign code for export.

Pujan Motiwala · Checked against the Gazette on · IBR 2026, in force from 1 October 2026

What is Form I Part A?

Form I Part A of the Indian Boiler Regulations, 2026 is the inspecting Authority's certificate of inspection during construction, boiler made to a foreign code for export, prescribed under regulation 4. Under the Indian Boiler Regulations, 1950 it was Form II-A (inspecting authority certificate of inspection during construction in respect of the boiler made to foreign code).

Download Form I Part A as a PDF: the form as notified, cut from the Gazette of India (No. 596, 1 October 2026) with nothing changed.

Who issues and signs Form I Part A?

The Inspecting Authority that supervised construction of a boiler built in India to a foreign code for export.

What does Form I Part A record?

  • Type, length, diameter and design pressure of the boiler, the maker and shop number
  • That it was built under the Inspecting Authority's supervision and inspected at stages by the Competent Person
  • How the boiler is stamped
  • The test pressure and date, with details of tests and inspections attached
  • That the design matches the maker's drawing approved and signed by the Inspecting Authority

When is Form I Part A filed, and with what?

Sent with the boiler and the maker's certificate required by the foreign code, which the Inspecting Authority countersigns.

What changed for Form I Part A from IBR 1950?

New in IBR 2026: a certificate for boilers made in India to a foreign code (ASME, for example) for export. See ASME vs IBR 2026.

  • Form I Part B: Certificate of inspection for shop assembled boilers (was Form II(1))
  • Form I Part C: Certificate of inspection for site assembled boilers at maker's works (was Form II(2))
  • Form I Part D: Inspecting Authority's certificate of inspection during construction of boilers with permitted variations from standard conditions (was Form II-B)
  • Form I Part E: Inspecting Authority's certificate of inspection after completion of boiler erection at assembly site (was Form II-C)
  • Form VIII: Final inspection report for boiler components
Quoted from the regulations (2)

“INSPECTING AUTHORITIES CERTIFICATE OF INSPECTION DURING CONSTRUCTION IN RESPECT OF A BOILER MADE TO FOREIGN CODE FOR EXPORT”

IBR 2026, regulation 4

“was constructed under our supervision and inspected at various stages at construction by the Competent Person”

IBR 2026, Form I Part A

One email when the regulation or a form changes. No newsletter; reply “stop” any time.

See a boiler's IBR folder produced from its material certificates, with a sample company.

Free. Resets every night.

Built for a boiler manufacturer: ERP for boiler manufacturers · how the folder is produced · other rules an ERP must meet

Official sources

What this page is not

A guide written by Ahrom Labs from the Gazette text; not legal advice. The Gazette governs wherever this page differs from it, and a state's Chief Inspector of Boilers may set procedures of their own. Last updated .