Form IV Part F: Certificate of manufacture and test of forgings
The certificate for forgings used in a boiler.
Pujan Motiwala · Checked against the Gazette on · IBR 2026, in force from 1 October 2026
What is Form IV Part F?
Form IV Part F of the Indian Boiler Regulations, 2026 is the certificate of manufacture and test of forgings, prescribed under regulation 14 and 58 to 62. Under the Indian Boiler Regulations, 1950 it was Form III-G (certificate of manufacture and test of forgings).
Download Form IV Part F as a PDF: the form as notified, cut from the Gazette of India (No. 596, 1 October 2026) with nothing changed.
Who issues and signs Form IV Part F?
The forge and the Inspecting Authority. Forgings from well-known forges recognised by the Central Boilers Board need no Inspecting Authority signature.
What does Form IV Part F record?
- Certificate number and date, heat number and details of the raw material
- Maker and customer, drawing numbers, description, quantity and serial numbers
- Forge shop identification
- Chemical composition and heat treatment
- Physical tests: tensile strength, transverse bend test, elongation, other tests
- Signatures of the maker, the Competent Person, and the Inspecting Authority or well-known forge
When is Form IV Part F filed, and with what?
Supplied with the forgings to the buyer and kept with the boiler's records (regulation 308).
What changed for Form IV Part F from IBR 1950?
Under IBR 1950 this was Form III-G.
Related forms
- Form IV Part A: Constructor's certificate of manufacture and test (was Form III)
- Form IV Part B: Certificate of manufacture and test for pipes (was Form III-A)
- Form IV Part C: Certificate of manufacture and test for tubes (was Form III-B)
- Form IV Part D: Certificate of manufacture and test of boiler mountings and fittings (was Form III-C)
- Form IV Part E: Certificate of manufacture and test of castings (was Form III-F)
- Form IV Part G: Certificate of manufacture and test for headers, desuperheaters/attemperators, blowdown tanks, feed water tanks, accumulators and deaerators (was Form III-H)
- Form IV Part H: Certificate of manufacture and test for dished ends and end covers (was Form III-I)
- Form XXII: Certificate of manufacture and test for small industrial boilers (was Form XVII)
- Form XXIII: Certificate of manufacture and test for small solar boilers (was Form XVII)
Quoted from the regulations (2)
“A certificate of manufacture and test in Form-IV(Part-F), signed by the maker and the Inspecting Authority shall be furnished.”
IBR 2026, regulation 14
“in the case of forgings manufactured by well known forges recognised by the Central Boilers Board, signature of Inspecting Authority shall not be required.”
IBR 2026, regulation 14
See a boiler's IBR folder produced from its material certificates, with a sample company.
Built for a boiler manufacturer: ERP for boiler manufacturers · how the folder is produced · other rules an ERP must meet
Official sources
- Indian Boiler Regulations, 2026 (Gazette of India, Extraordinary, No. 596). Central Boilers Board, Department for Promotion of Industry and Internal Trade, October 1, 2026.
What this page is not
A guide written by Ahrom Labs from the Gazette text; not legal advice. The Gazette governs wherever this page differs from it, and a state's Chief Inspector of Boilers may set procedures of their own. Last updated .
Talk to us about your systems.
Tell us what's held together with workarounds right now. We reply to every message ourselves.