Boiler certificate renewal and inspection under IBR 2026
To renew a boiler's certificate under IBR 2026, the owner applies with the fee, prepares the boiler for inspection (emptied, cleaned, doors and fittings opened, valves taken apart) and the Competent Person inspects it inside and out, with a hydraulic test at 1.25 times the design pressure where one is required. Power plant boilers and waste heat boilers in continuous process plants follow Appendix H and Appendix I, and apply with Form IX.
Pujan Motiwala · Checked against the Gazette on · IBR 2026, in force from 1 October 2026

How is a boiler certificate renewed under IBR 2026?
The owner applies for renewal with the fee under regulation 305, prepares the boiler for inspection, and the Competent Person inspects it; if it is fit, a fresh certificate for use is issued in Form XII. Boilers for electric power generation and waste heat boilers in continuous process plants follow Appendix H and Appendix I, and their application carries the details in Form IX: feed water quality, safety valves, protection device tests, stoppages and past repairs.
How must the boiler be prepared?
Regulation 295 is specific: "At every boiler examination or grant of renewal of a certificate, the boiler shall be empty and all its parts shall be thoroughly cleaned." Manhole, handhole and sight hole doors, cleaning plugs, header and mud drum caps, fire bars, bearers, bridges, arches, burners and stoker fittings come off, and "All valves and cocks comprising the boiler mounting shall be opened up and taken apart". Smoke tubes, the outside of water tubes, smoke boxes and flues are swept; the boiler is disconnected from any other boiler under steam; no blank flange may sit between a safety valve chest and the boiler.
Large boilers get some relief: for boilers of 90 tonnes per hour or more on treated feed water, at alternate annual inspections the Competent Person may relax the preparation, provided at least the three bottom rows, or all tubes in the first pass of heat, are opened up.
What happens if the boiler isn't ready?
The inspection doesn't happen. Under regulation 311, if the boiler isn't properly disconnected, cleaned or descaled, or is too hot, the Competent Person "shall decline to proceed with the inspection" and reports it for orders. A re-inspection of a defective boiler after repairs pays the fee again (regulation 305(5)).
What does the Competent Person check?
Every accessible part, inside and out (regulation 311): going inside where the size allows; signs of oil or scale, which the regulation calls "particularly bad"; corrosion and grooving along seams, which is more serious than the same corrosion in solid plate; the seating blocks in damp settings; and for forced circulation boilers, that water flows through every section. Where wear is suspected, insulation or masonry may be removed and plates drilled to find the real thickness; a wasted shell is recalculated under regulation 312.
When is a hydraulic test needed at renewal?
At 1.25 times the design pressure when one is required: "Hydraulic tests of boilers at subsequent examination shall be at 1.25 times the design pressure of the boiler." Water tube, locomotive type and all tubular boilers are tested at each inspection for the grant or renewal of a certificate unless the Chief Inspector waives it, and a boiler the Competent Person can't get inside is tested at 1.5 times the design pressure. The Competent Person may order a test at any inspection. Compare the ASME hydrostatic test.
What does renewal cost?
The fee in regulation 305 by heating surface; for heat recovery steam generators with finned tubes, on the bare tube area plus a quarter of the fin area. "For renewal of certificate for a period of six months or less on the request of owner, half of applicable fee shall be payable."
How should an owner keep track?
By the certificate's expiry, the inspection date booked well before it, the preparation done and checked, and the inspection notes and hydraulic test entered in the boiler's Memorandum of Inspection Book. Keep the records for the boiler's life, as regulation 308 requires. Our boiler ERP tracks installed boilers due for service and keeps each boiler's IBR folder; see ERP for boiler and pressure vessel shops.
Quoted from the regulations (8)
“At every boiler examination or grant of renewal of a certificate, the boiler shall be empty and all its parts shall be thoroughly cleaned.”
IBR 2026, regulation 295(1)(a)(i)
“All valves and cocks comprising the boiler mounting shall be opened up and taken apart and the valves or cocks grounded, when necessary, before the Competent Person's visit.”
IBR 2026, regulation 295(1)(a)(ii)
“For boilers used for electric power generation, the inspection shall be carried out as per the provisions of Appendix-H.”
IBR 2026, regulation 295(7)
“For Waste Heat Boilers (Fired and Unfired) used exclusively in continuous process plants, the inspection shall be carried out as per the provisions of Appendix-I.”
IBR 2026, regulation 295(8)(a)
“Hydraulic tests of boilers at subsequent examination shall be at 1.25 times the design pressure of the boiler.”
IBR 2026, regulation 298(6)
“Water tube locomotive type boiler and all tubular boilers shall be hydraulically tested at each inspection for the grant or renewal of a certificate, unless such test is waived under the orders of the Chief Inspector.”
IBR 2026, regulation 298(8)
“For renewal of certificate for a period of six months or less on the request of owner, half of applicable fee shall be payable.”
IBR 2026, regulation 305(4)
“In case he find that proper provision for disconnection has not been made or that the boiler has not been properly cleaned, or scaled, or that is unreasonably hot, he shall decline to proceed with the inspection”
IBR 2026, regulation 311(2)
See a boiler's IBR folder produced from its material certificates, with a sample company.
Built for a boiler manufacturer: ERP for boiler manufacturers · how the folder is produced · other rules an ERP must meet
Official sources
- Indian Boiler Regulations, 2026 (Gazette of India, Extraordinary, No. 596). Central Boilers Board, Department for Promotion of Industry and Internal Trade, October 1, 2026.
What this page is not
A guide written by Ahrom Labs from the Gazette text; not legal advice. The Gazette governs wherever this page differs from it, and a state's Chief Inspector of Boilers may set procedures of their own. Last updated .
Talk to us about your systems.
Tell us what's held together with workarounds right now. We reply to every message ourselves.