B31.1 is the Power Piping code, for power stations, industrial and heating plants and boiler external piping. B31.3 is the Process Piping code, for refineries, chemical, pharmaceutical, hydrogen and similar plants, with fluid service categories that scale the rules to the hazard. Neither is part of the Boiler and Pressure Vessel Code, but both use Section IX for welding. The current editions are B31.1-2026 and B31.3-2024.

Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

Two pipe spools meeting at a flanged tee, one insulated, one bare stainless with a valve: power and process piping.
Video chapters (10)
  1. 0:00ASME B31.1 (2026) vs. B31.3 (2024) Piping Overview
  2. 0:21Boiler External Piping (BEP) Boundary (16 TAC §65.2) & S / A / PP Stamps
  3. 0:46Side-by-Side: State Edition Lag (OH 2022 / MI 2018) & Forms CC-1 / CC-2
  4. 1:08The 5 Owner-Assigned B31.3 Fluid Service Categories (Normal, D, M, HP, Pure)
  5. 1:28Hydrostatic Test Difference: B31.1 Para. 137 (1.5×) vs. B31.3 Stress Ratio
  6. 1:48Shared ASME Section IX Welding, QW-322 Continuity, Section V & Section II
  7. 2:088 Verified Quotes Across B31.1-2026, B31.3-2024, CC-1/CC-2 & Texas BEP
  8. 2:30Keeping Shared Section IX Weld, MTR & NDE Records in Boiler ERP
  9. 2:482025 BPVC & Authorized Inspector Verification Notice
  10. 3:00Series Wrap-Up: Full ASME Hub (S01), Section I vs. IV (S10) & PP Stamp (S19)

What is the difference between ASME B31.1 and B31.3?

B31.1 is for power piping and B31.3 for process piping. ASME describes B31.1 as covering "piping systems typically found in electric power generating stations, industrial plants, geothermal heating systems, and heating and cooling systems", and B31.3 as setting "process piping requirements typically found in petroleum, chemical, pharmaceutical, hydrogen, paper & pulp, and power generation industries". Both are ASME standards outside the Boiler and Pressure Vessel Code, and both are paid; this guide cites their paragraphs.

B31.1 Power PipingB31.3 Process Piping
Current edition20262024
Typical plantsPower stations, industrial steam, district heating and coolingRefineries, chemical, petrochemical, pharmaceutical, hydrogen, food
Special scopeBoiler external piping (BEP)Fluid service categories: Normal, Category D, Category M, High Pressure, High Purity
Hazard approachOne set of rules, conservativeRules scale with the fluid's hazard
Hydrostatic test1.5 × design pressure1.5 × design pressure, adjusted by the stress ratio at temperature
Welding qualificationSection IXSection IX, with B31.3's own additions
CertificationBEP by a Section I certificate holder; CC-1 and CC-2 certificates of complianceNone

What are the current editions of B31.1 and B31.3?

B31.1-2026 and B31.3-2024, the latest editions ASME lists on its store as of 6 November 2026. Piping codes have their own cycles, separate from the BPVC's two-year cycle, so check which edition your contract or jurisdiction names; Ohio's rule, for example, adopts B31.1 at 2022 and Michigan's at 2018.

What is boiler external piping?

The piping from a power boiler out to and including the valves Section I requires. Texas's boiler rules define it as starting where the Section I or Section VIII boiler proper ends (at the first circumferential joint, flange face or threaded joint) "and which extends up to and including the valve or valves required by ASME". It is designed to B31.1 but is part of the Section I boiler: built by a holder of a Section I certificate (S, A or PP) and inspected by the Authorized Inspector. That is why ASME lists B31.1 among the required books for the S and PP certificates. See Section I vs Section IV.

Is there an ASME form for B31.1 piping?

Yes: ASME publishes two certificates of compliance for B31.1, CC-1 for the complete piping system and CC-2 for fabricated components, subassemblies and assemblies, free on its data report forms page. B31.3 has no equivalent ASME form; the owner's records and the examination and test reports carry the evidence.

What are B31.3 fluid service categories?

  • Normal: most services.
  • Category D: non-flammable, non-toxic fluids at low pressure and moderate temperature; lighter rules.
  • Category M: fluids where a single small exposure can cause serious harm; stricter rules.
  • High Pressure and High Purity: chapters of their own.

The owner assigns the category, and with it the examination, testing and design rules that apply.

What hydrostatic test does each require?

B31.1: at least 1.5 × design pressure (paragraph 137). B31.3: at least 1.5 × design pressure, multiplied by the ratio of allowable stress at test temperature to that at design temperature (paragraph 345.4.2), the same logic as a Division 1 vessel's stress ratio. See the hydrostatic test guide.

Do B31.1 and B31.3 use Section IX?

Yes. Welding procedures and welders are qualified to Section IX, so a shop's WPSs and PQRs can serve its vessel and piping work where the variables fit both codes, and the same continuity rule (QW-322) applies to its welders.

Where do piping NDE and materials come from?

NDE methods from Section V, with the piping code setting how much and the acceptance criteria; materials are mostly ASME or ASTM specifications, see Section II.

What does our software keep for piping jobs?

Our US boiler demo keeps the weld map (shell seams and nozzles), WPS and PQR, welder continuity, MTR and NDE records for each boiler or vessel inside the job's ASME record package; the same records serve piping welds made under Section IX. It has no piping module, no B31.3 categories and no CC-1 form. See job shop ERP and ERP for boiler and pressure vessel shops.

Quoted from the official text (8)

“ASME B31.1 covers piping systems typically found in electric power generating stations, industrial plants, geothermal heating systems, and heating and cooling systems.”

ASME B31.1 product page, description

“B31.1 - 2026”

ASME B31.1 product page, edition

“B31.3 sets process piping requirements typically found in petroleum, chemical, pharmaceutical, hydrogen, paper & pulp, and power generation industries.”

ASME B31.3 product page, description

“B31.3 - 2024”

ASME B31.3 product page, edition

“Certificate of Compliance for the Complete Piping System”

ASME Data Report Forms, B31.1

“Certificate of Compliance for Fabricated Components, Subassemblies, and Assemblies”

ASME Data Report Forms, B31.1

“B31.1 Power Piping”

ASME Required Code Books, PP and S certificates

“and which extends up to and including the valve or valves required by ASME.”

16 Tex. Admin. Code § 65.2, boiler external piping

WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.

A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.

A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.

Official sources

What this page is not

A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.