ASME vs IBR 2026: how the two boiler codes fit together
In India a boiler is registered under the Indian Boiler Regulations, 2026, whatever code it was designed to. IBR 2026 does accept ASME in defined ways: ASME materials, ASME welding consumables and NDT certificates, ASME-designed parts where IBR has no provision, and inspection of export boilers to a foreign code with a Form I Part A certificate.
Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

Video chapters (10)
- 0:00ASME BPVC 2025 vs. India IBR 2026 Overview
- 0:20Private Standard (ASME) vs. Statutory Law (Boilers Act 2025 / IBR)
- 0:45Side-by-Side Comparison Across 7 Dimensions (Scope, Forms & In-Service)
- 1:05Where IBR 2026 Accepts ASME: Regulations 3, 4, 5, 30, 71 & 7
- 1:303 Hard Rules: India Registration, PESO Pressure Vessels & No Welder Cross-Credit
- 1:50Dual Inspection: Authorized Inspector (AIA) vs. IBR Inspecting Authority
- 2:107 Official Gazette of India No. 596 Excerpts
- 2:30Running One Linked Heat & Weld Record Set for Dual-Code ERP Packages
- 2:502025 BPVC & IBR 2026 Verification Notice
- 3:00Next Steps: Buying ASME Equipment from India (S27) & Materials List (S05)
How do ASME and IBR 2026 compare?
ASME is a private standard given legal force by the US states and Canadian provinces that adopt it; IBR 2026 is India's statutory regulation for boilers, under the Boilers Act, 2025. They overlap on the same boilers but differ in who approves, inspects and records:
| ASME BPVC | IBR 2026 | |
|---|---|---|
| What it is | A private standard, given legal force by US states and Canadian provinces that adopt it | Statutory regulations under the Boilers Act, 2025, in force across India |
| Written by | ASME committees | The Central Boilers Board |
| Covers | Boilers, pressure vessels, nuclear, transport tanks | Boilers, steam pipes and their parts (pressure vessels are outside IBR) |
| Shop approval | ASME certificate, after a joint review (U and S stamps) | Recognition as a manufacturer by class, under IBR 2026 |
| Independent inspection | Authorized Inspector from an accredited agency | Inspecting Authority, Competent Person |
| Record of the item | Manufacturer's Data Report (P-2, P-3, U-1) | Forms: Inspecting Authority's certificate (Form I), maker's certificate (Form IV), material certificates (Form V) |
| Welders | Section IX qualification (WPQ) | IBR welder certificate |
| In service | NBIC and the jurisdiction (state rules) | IBR registration, periodic inspection and certificate for use |
Does IBR accept ASME boilers and materials?
Yes, in defined ways, all quoted from the Gazette:
- Parts IBR doesn't cover may be designed, made, inspected and certified to the ASME Code (among others), with the Inspecting Authority's permission (regulation 3(4)).
- Exotic tubes (titanium and the like) may be approved to ASME and other international codes (regulation 3(5)).
- Export boilers may be inspected by an Indian Inspecting Authority to a foreign code and certified in Form I Part A (regulation 4). See buying from India and IBR Form I Part A.
- Exemption of a boiler or component built to an international code, ASME included, on conditions (regulation 5).
- Materials to ASME (and IS, BS, EN, DIN, JIS) may be used; IBR's own material table lists ASME SA and SB specifications by name (regulation 30); the materials list shows which common ones it names. See Section II.
- Electrodes are classified to ASME Section II Part C (SFA) or AWS specifications (regulation 71).
- NDT personnel with ASNT certificates are accepted alongside ISNT (regulation 7). See Section V.
Is an ASME-stamped boiler legal to run in India?
Only once it is registered under IBR 2026: in India a boiler is registered under the Indian Boiler Regulations whatever code it was designed to. An ASME stamp doesn't replace IBR registration, and the regulation 5 exemption for boilers built to an international code applies only on its conditions. See boiler registration documents.
Are pressure vessels covered by IBR?
No. IBR applies to boilers and steam pipes; unfired pressure vessels are outside it (vessels for compressed gases fall under PESO's Static and Mobile Pressure Vessels (Unfired) Rules instead). In the US, by contrast, a pressure vessel is usually regulated by the state and built to Section VIII.
Who inspects a boiler under each?
Under ASME, an Authorized Inspector employed by an ASME-accredited inspection agency; under IBR 2026, the Inspecting Authority and Competent Persons it recognizes. A boiler built in India for export to the US can have both: the Authorized Inspector for the ASME stamp and the Indian Inspecting Authority's Form I Part A under regulation 4.
Does an IBR welder certificate count for ASME work?
No: ASME work needs a Section IX qualification (WPQ), and IBR boiler work needs an IBR welder certificate. A welder working on both needs both, and each has its own renewal rules; see welder continuity for the ASME side.
What does a shop working to both codes need?
Two sets of approvals, two sets of welder qualifications and two report formats over the same welds and materials. The records underneath are the same: heat numbers, welders, procedures, NDE, tests. That is the case for keeping them once and printing either set of forms. Our boiler software does this both ways: the India build, which a boiler maker runs today, assembles the IBR statutory folder from the certificate bank (see the IBR statutory folder), and the US demo prints the ASME record package. The IBR side is covered in the IBR 2026 guide.
Quoted from the official text (7)
“Where no specific provision is made in these regulations for design or manufacture of any pressure part, the Inspecting Authority may permit the design, manufacture, stage inspections and certification of such pressure parts including the valves; mountings and fittings conforming to the Codes or Standards like British Standards (BS), European Standards (EN), American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code”
IBR 2026, regulation 3(4)
“the inspecting authority may inspect any boiler meant for export during the various stages of its construction to comply with the requirements of any foreign code and may grant a certificate in Part-A of Form-I.”
IBR 2026, regulation 4
“design and construction of boiler or boiler component is in accordance with international code or standard including British Standards (BS), European Standards (EN), American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code”
IBR 2026, regulation 5(1)
“In addition to the above, materials conforming to IS or to any of the International codes BS, EN, ASME, DIN and JIS can also be used.”
IBR 2026, regulation 30, notes to the material table
“Specifications for Filler Alloys (SFA) of American Society of Mechanical Engineers (ASME) Part IIC”
IBR 2026, regulation 71(2)
“Level-III NDT Certificates from Indian Society for Non-destructive Testing(I.S.N.T.) or American Society for Non-destructive Testing( A.S.N.T.)”
IBR 2026, regulation 7
“The tubes of boilers and heat exchangers made of titanium and other exotic metals may be approved as per international codes, including American Society of Mechanical Engineers (ASME)”
IBR 2026, regulation 3(5)
WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.
A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.
A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.
Official sources
- Boiler and Pressure Vessel Certification. ASME, November 1, 2026.
- Indian Boiler Regulations, 2026 (Gazette of India, Extraordinary, No. 596). Central Boilers Board, Department for Promotion of Industry and Internal Trade, October 1, 2026.
- Boiler and Pressure Vessel Certificates of Authorization and the Certification Mark: Informational Handbook (BPV-GUI-03). ASME, May 12, 2023.
What this page is not
A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .