ASME Section I vs IV: power vs heating boilers

Section IV covers heating boilers: steam boilers up to 15 psi (1 bar), and hot water boilers up to 160 psi (11 bar) and 250 °F (121 °C). Anything above those limits is a power boiler under Section I, which has stricter design, material, examination and inspection rules. The certificates differ too: S (with A, E, M and PP) for Section I, H and HLW for Section IV.

Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

A large industrial firetube steam boiler beside a small wall-hung heating boiler: power boilers and heating boilers.
Video chapters (10)
  1. 0:00ASME Section I vs. Section IV: Steam & Hot Water Limits (HG-101)
  2. 0:20Heating Envelope (15 psi / 160 psi / 250 °F) vs. Power Boilers
  3. 0:40Boiler Stamps: S, A, E, M, PP vs. H, HLW, PRT & S-Holder Add-On
  4. 1:00Data Reports Compared: P-2, P-2A, P-3, P-4/P-4A vs. H-2, H-3 & H-5
  5. 1:20Authorized Inspector (AIA) vs. Cast Iron / Aluminum 1-Year Designee
  6. 1:38Routing Examples: 120 psi Hot Water, 150 psi Steam & B31.1 BEP
  7. 2:00What Changes for the Shop: PG-27, Volumetric NDE, 1.5× Hydro & Books
  8. 2:20Boiler External Piping (B31.1 First Stop Valve) & India IBR 2026
  9. 2:40Section I Firetube Packages & Form P-2 in Boiler ERP
  10. 2:56Full Section I vs. IV Table, PG-99 Calculator & S Stamp Guides

Where is the line between a Section I and a Section IV boiler?

The line is pressure and temperature: Section IV covers steam boilers up to 15 psi (1 bar) and hot water boilers up to 160 psi (11 bar) and 250 °F (121 °C); anything above either limit is a power boiler under Section I. Section IV states its limits in its scope paragraph (HG-101 in the 2025 Edition).

Section IV (heating boilers)Section I (power boilers)
Steam boilersUp to 15 psi (1 bar)Above 15 psi (1 bar)
Hot water boilersUp to 160 psi (11 bar) and 250 °F (121 °C)Above 160 psi (11 bar) or above 250 °F (121 °C)
Typical useSpace heating, domestic hot waterProcess steam, power generation, high-temperature hot water
ASME certificatesH; HLW for lined potable water heatersS, plus A (assembly), E (electric), M (miniature), PP (pressure piping)
Main data reportsH-2, H-3; H-5 and H-5A for cast iron and cast aluminumP-2, P-3, P-4 family

The certificates are as ASME's certification page lists them. Section IV allows cast iron and cast aluminum sectional boilers, which Section I does not, and its rules are simpler throughout because far less energy is stored at low pressure.

Which certificate does each kind of boiler need?

A power boiler is built and stamped by an S certificate holder; a heating boiler by an H holder. Section I also has A for assembling power boilers, E for electric boilers, M for miniature boilers and PP for boiler external piping; Section IV has HLW for lined potable water heaters. Parts makers without design responsibility can hold PRT in both sections. Each is a separate certificate with its own joint review, though ASME's FAQ says an S holder can add A or PP without a full new review. See ASME stamps.

Which data report does each use?

A Section I boiler is reported on Form P-2 (all types except watertube and electric), P-2A (electric) or P-3 (watertube boilers, superheaters, waterwalls and economizers), with P-4 for parts and P-4A for fabricated piping. A Section IV boiler uses H-2 (all types except watertube and cast iron), H-3 (watertube) or the H-5 and H-5A master data reports for cast iron and cast aluminum. All are free fillable PDFs on ASME's data report forms page; see data reports.

Does a Section IV boiler need an Authorized Inspector?

Yes, except a cast iron or cast aluminum boiler. The H certificate for cast iron and cast aluminum boilers needs no inspection agency agreement: ASME's handbook says it is issued for one year, renewed by an annual joint review led by an ASME Designee with no Authorized Inspection Agency involved. Every other Section IV and Section I certificate needs an agreement with an ASME-accredited agency, whose Authorized Inspector inspects the boiler and signs its data report.

What changes for the shop between Section I and Section IV?

Section I is stricter at every step:

  • Design: Section I has its own formulas in Part PG (PG-27 for cylindrical shells and tubes) and sets thicknesses for drums, headers and tubes; Section IV's rules are simpler and include minimum thicknesses.
  • Examination: more volumetric examination of welds under Section I.
  • Testing: a Section I boiler is hydrostatically tested to at least 1.5 times its maximum allowable working pressure (PG-99); Section IV sets its own, lower test.
  • Code books: ASME's required list for an S certificate is Section I, Section II Parts A to D, Section V, Section IX, B31.1 Power Piping and CA-1; for H and HLW (except cast iron) it is Section II Parts A, B and C, Section IV, Section IX and CA-1; for cast iron H, Section IV and CA-1.

What hydrostatic test does a Section I boiler need?

At least 1.5 times its MAWP (PG-99): a firetube boiler with an MAWP of 150 psi is tested to at least 225 psi, with the Authorized Inspector present. The hydrostatic test guide has a calculator for Section I and Section VIII.

Who builds the boiler external piping?

A holder of a Section I certificate that covers it: S, A or PP. Boiler external piping runs from the boiler to the first stop valve and beyond, as Section I defines it; it is designed to B31.1 but is part of the Section I boiler, inspected by the Authorized Inspector. That is why B31.1 is on the required code book list for those certificates.

How does this work in India?

Boilers in India are registered under the Indian Boiler Regulations, 2026, whichever ASME section they were designed to; IBR draws its own lines for small industrial boilers. How the two fit together is in ASME vs IBR 2026.

What does our software keep for a Section I boiler?

Our US boiler demo prints the ASME record package for a firetube boiler from the job's records: a Form P-2 layout (our own, carrying the form's fields, not a copy of ASME's form), the weld map, WPS and PQR, QW-322 welder continuity, MTRs by heat number, NDE, PWHT and the hydro test at 1.5 × MAWP. There are no Section IV jobs in the demo. See ERP for boiler and pressure vessel shops.

Quoted from the official text (8)

“PP - Pressure Piping”

ASME certification page, Section I certificates

“H - Heating Boilers/Cast Iron Sectional Heating Boiler”

ASME certification page, Section IV certificates

“Manufacturers' Data Report for All Types of Boilers Except Watertube and Electric”

ASME Data Report Forms, Section I

“Manufacturers' Data Report for Watertube Boilers, Superheaters, Waterwalls, and Economizers”

ASME Data Report Forms, Section I

“Manufacturer's Data Report for All types of Boilers Except Watertube and those Made of Cast Iron”

ASME Data Report Forms, Section IV

“The H (Cast Iron and/or Cast Aluminum) Certificate of Authorization is issued for 1 year.”

ASME BPV-GUI-03, section 2

“The Joint Review is conducted by an ASME Designee appointed by ASME (No Authorized Inspection Agency involvement is required).”

ASME BPV-GUI-03, section 2

“Pressure Piping and Power Boilers Code Books Required BPVC Section I-Rules for Construction of Power Boilers”

ASME Required Code Books, PP and S certificates

WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.

A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.

A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.

What this page is not

A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .