ASME Section V: nondestructive examination
ASME Section V sets how nondestructive examinations are done: radiography, ultrasonic, magnetic particle, liquid penetrant, visual and leak testing, each in its own Article. It covers the method, not the verdict: which welds are examined, how much, and what counts as a rejectable flaw come from the construction section, such as Section VIII or Section I.
Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

Video chapters (10)
- 0:00ASME Section V Overview: NDE Methods vs. Construction Code Verdict
- 0:18Two-Code Handoff: Section V Article 2 vs. UW-51 & UW-52 Acceptance
- 0:38Section V Articles 1–10 (RT, UT, PAUT, TOFD, PT, MT, VT & Leak)
- 1:02Mandatory Full RT (UW-11), Designer Selection & Required Shop Books
- 1:22NDE Personnel Qualification: SNT-TC-1A, IBR 2026 & Sec IX (IX-16-28)
- 1:444 Things Every ASME NDE Report Must Log for the Data Report
- 2:04Official ASME & IBR 2026 Regulation 7 Citations
- 2:24Linking NDE Seam Results & Examiner Credentials in Boiler ERP
- 2:402025 Edition Scope & Inspector Verification
- 2:56Full Section V Guide, Joint Efficiency & Section XIII Next
What is ASME Section V?
Section V is the Code's book of nondestructive examination methods: how radiography, ultrasonic, magnetic particle, liquid penetrant, visual and leak testing are performed, written so that every construction section can point to one set of methods. ASME describes it as its "NDE standards and specifications". The Code text is ASME's and paid; this guide cites its Articles, and your 2025 Section V is the authority.
Does Section V say whether a weld passes?
No. Section V covers the method; the verdict comes from the construction section. A radiograph is taken as Section V says (film or digital, source and geometry, image quality indicators, density), but whether an indication on it is acceptable is judged by, for example, Section VIII Division 1's UW-51 for full radiography or UW-52 for spot radiography. That split is why an NDE procedure cites Section V and the NDE report cites Section VIII.
Which Article covers which method?
| Article | Method |
|---|---|
| 1 | General requirements |
| 2 | Radiographic examination (RT), film and digital |
| 4 | Ultrasonic examination (UT) of welds, including phased array and time-of-flight diffraction |
| 5 | Ultrasonic examination of materials |
| 6 | Liquid penetrant examination (PT) |
| 7 | Magnetic particle examination (MT) |
| 9 | Visual examination (VT) |
| 10 | Leak testing |
Section V has further Articles for other methods (eddy current, acoustic emission and more) and a second subsection that adopts ASTM standards for NDE.
Who decides how much of a vessel is examined?
The construction section and the designer. Division 1 makes full radiography mandatory in some cases (UW-11) and otherwise lets the designer choose, and the choice sets the joint efficiency and so the wall thickness. Section I sets its own examination for boilers.
How are NDE personnel qualified?
To a written practice, as the construction section requires. In US and Canadian shops that is usually the employer's written practice to ASNT's SNT-TC-1A, with Level I, II and III personnel; the construction section names the standards it accepts. India's IBR 2026 accepts Level III certificates from the Indian Society for Non-destructive Testing or the American Society for Non-destructive Testing; see ASME vs IBR 2026.
Does a shop need Section V for an ASME certificate?
Yes, if it welds. ASME lists Section V among the required code books for the U and S certificates, and allows it to be left out only if welding, brazing and fusing aren't in the shop's scope. See BPVC sections.
Can a welder be qualified by radiography?
Yes, for most processes: Section IX allows radiography or ultrasonic examination of the test coupon in place of bend tests, with Section V setting the method. GMAW short-circuit welders can't be qualified by radiography; ASME interpretation IX-16-28 (2015 Edition) allows ultrasonic examination for them. See welder qualification.
What should an NDE report show?
The method and procedure, the Section V and construction-code references, the welds or areas examined, the extent (full, spot), the technique, the examiner and their level, the date, the results with any indications, and the acceptance decision. NDE reports go in the vessel's file and the data report records the extent of radiography.
What does our software keep for NDE?
Our US boiler demo records each NDE report (method, extent, welds covered, examiner and level, date, result), links it to the seams on the weld map, and prints both in the job's ASME record package. The demo has no film or image storage. See ERP for boiler and pressure vessel shops.
Quoted from the official text (3)
“Explore ASME BPVC Section V for clear NDE standards and specifications.”
ASME Section V product page, description
“BPVC Section V-Nondestructive Examination”
ASME Required Code Books, U and UM certificates
“Level-III NDT Certificates from Indian Society for Non-destructive Testing(I.S.N.T.) or American Society for Non-destructive Testing( A.S.N.T.)”
IBR 2026, regulation 7
WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.
A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.
A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.
Official sources
- Boiler and Pressure Vessel Certification. ASME, November 1, 2026.
- BPVC Section V: Nondestructive Examination (2025). ASME, July 1, 2025.
- Required Code Books. ASME, November 5, 2026.
- Indian Boiler Regulations, 2026 (Gazette of India, Extraordinary, No. 596). Central Boilers Board, Department for Promotion of Industry and Internal Trade, October 1, 2026.
What this page is not
A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .