Form XIV: Steam pipes and connected fittings: Memorandum of Inspection Book
The inspection record of a steam pipeline and its fittings: particulars, dimensions, calculations, hydraulic tests and inspection notes.
Pujan Motiwala · Checked against the Gazette on · IBR 2026, in force from 1 October 2026
What is Form XIV?
Form XIV of the Indian Boiler Regulations, 2026 is the steam pipes and connected fittings: Memorandum of Inspection Book, prescribed under regulation 322(3). Under the Indian Boiler Regulations, 1950 it was Form XIV (steam pipes and connecting fittings).
Download Form XIV as a PDF: the form as notified, cut from the Gazette of India (No. 596, 1 October 2026) with nothing changed.
Who issues and signs Form XIV?
Prepared by the Inspector; later entries by the Competent Person at each inspection.
What does Form XIV record?
- District, owner, address and the registration numbers of the boilers the pipes are connected to
- The plan of the steam pipes and fittings: drawing number, total length, connected vessels, fee and approval
- Particulars and dimensions: pipe material, outside diameter, thickness, make, flanges, elbows and tees, supports, flexibility and drainage
- Calculations for the steam pipes, and the approved pressure and temperature
- Dates and notes of each inspection and hydraulic test, repairs, alterations and accidents
When is Form XIV filed, and with what?
Submitted to the Chief Inspector, who checks the particulars and calculations and approves the pressure and temperature for the pipeline (regulation 322(3)(e)).
What changed for Form XIV from IBR 1950?
The number is unchanged from IBR 1950: Form XIV was, and is, the steam pipe form. The 2026 heading reads "Steam Pipes and Connected Fittings".
Related forms
- Form X: Provisional order under section 14 of the Boilers Act, 2025 (was Form V)
- Form XI: Memorandum of Inspection Book or Registration Book (was Form I)
- Form XII: Certificate for use of a boiler (was Form VI)
Quoted from the regulations (4)
“A memorandum of Inspection Book shall be prepared in respect of steam pipe and fittings in Form-XIV.”
IBR 2026, regulation 322(3)(a)
“the Inspector shall enter in ink, all particulars and dimensions of the steam pipe and fitting with calculations for the various parts in detail, particulars of hydraulic test and his inspection notes”
IBR 2026, regulation 322(3)(a)
“The pressure and temperature once approved for the particular steam pipe line shall not be altered except on a written authority from the Chief Inspector.”
IBR 2026, regulation 322(3)(e)
“PLAN OF STEAM PIPES & THEIR CONNECTED FITTINGS”
IBR 2026, Form XIV
See a boiler's IBR folder produced from its material certificates, with a sample company.
Built for a boiler manufacturer: ERP for boiler manufacturers · how the folder is produced · other rules an ERP must meet
Official sources
- Indian Boiler Regulations, 2026 (Gazette of India, Extraordinary, No. 596). Central Boilers Board, Department for Promotion of Industry and Internal Trade, October 1, 2026.
What this page is not
A guide written by Ahrom Labs from the Gazette text; not legal advice. The Gazette governs wherever this page differs from it, and a state's Chief Inspector of Boilers may set procedures of their own. Last updated .
Talk to us about your systems.
Tell us what's held together with workarounds right now. We reply to every message ourselves.