MDMT and impact test exemptions (UCS-66)
Carbon and low-alloy steels can turn brittle when cold, so ASME Section VIII Division 1 requires Charpy impact tests unless an exemption applies. UCS-66 gives exemption curves (A to D) by material and thickness against the vessel's MDMT; thin parts and lower stresses earn more exemption. Below −55 °F (−48 °C) most parts need testing.
Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

Video chapters (10)
- 0:00Cold Brittleness, Charpy Tests & the −55 °F (−48 °C) Cutoff
- 0:204-Step UCS-66 Exemption Method: Curves A–D, Thickness & UCS-66.1
- 0:42Specifying MDMT & Avoiding Needless Tests with Curve D (Normalized SA-516)
- 1:02UG-20(f) Ordinary Vessels (−20 to 650 °F), −55 °F Floor & UCS-68 Credit
- 1:22Charpy V-Notch Rules (UG-84): Base, Weld, HAZ & Sec IX Variables
- 1:42Who Supplies Results: Mill MTR (Put Temp on PO) vs. Shop PQR Plates
- 2:02Official BPVC 2025 Part UCS & Section II Part A Citations
- 2:26Printing MDMT & Linking Heat MTRs in Boiler ERP Record Packages
- 2:462025 Edition Notice & Authorized Inspector Verification
- 3:00Next Steps: PWHT (S32), Materials List (S05) & Section VIII (S08)
When is impact testing required for an ASME pressure vessel?
When a carbon or low-alloy steel part's minimum design metal temperature (MDMT) is colder than the exemption Division 1 allows for its material and thickness (UCS-66, 2025 Edition), and no other exemption applies. Steel that is tough at room temperature can fracture like glass when cold; impact testing proves the steel, welds and heat-affected zones are tough at the MDMT. The Code text and its curves are ASME's and paid; this guide outlines the method, and your 2025 book is the authority.
What is MDMT?
The coldest metal temperature at which the vessel may be at its MAWP: a cold winter start-up, an autorefrigerating flash, a cold fluid. It goes on the nameplate and the data report with its coincident pressure. See MAWP and MDMT.
How does the UCS-66 exemption work?
Division 1 works it out part by part:
- Assign the material to a curve. Figure UCS-66 has curves A to D. Curve A is for materials with the least toughness assurance; Curve D for the best (for example, normalized fine-grain plate). The Code lists which specification and heat treatment goes on which curve.
- Find the governing thickness of each part: for a butt joint, the thicker of the two members, with rules for corner, fillet and lap joints and for flat heads.
- Read the curve. It gives the coldest MDMT allowed without impact testing at that thickness. If the vessel's MDMT is warmer than that, the part is exempt.
- Take credit for low stress. When the part is stressed below its full allowable (thicker than needed, or at lower pressure), Figure UCS-66.1 lowers the exemption temperature further.
What are curves A to D?
Four material groups by toughness: A the least assured, D the best. Plate on a better curve is exempt to a colder temperature at the same thickness, so when the MDMT is cold, buying plate to a specification and heat treatment on the better curves (normalized SA-516, for example) can avoid impact testing altogether. The curve assignments are in the Code; check the note for your specification and heat treatment.
Is there a simple exemption for ordinary vessels?
Yes: UG-20(f) exempts P-No. 1 materials of limited thickness from impact testing when the vessel is hydrostatically tested to UG-99(b) or (c), has a design temperature between −20 °F (−29 °C) and 650 °F (343 °C), and has no unusual thermal or mechanical shock or cyclic loading. Most small carbon steel vessels in mild climates use it.
Is impact testing always required below a certain temperature?
Generally below −55 °F (−48 °C): at such low MDMTs Division 1 requires impact testing unless the part is very lightly stressed.
What does impact testing involve?
Charpy V-notch specimens are cut from the material, or from a test weld for weld metal and heat-affected zones, and broken at the test temperature. The energy absorbed must meet a minimum that depends on the material's strength and thickness (UG-84). When impact testing applies, the welding procedure must also be qualified with impact tests, which brings in Section IX's supplementary essential variables.
Can PWHT reduce the need for impact testing?
It can: Division 1 gives a temperature credit for post-weld heat treatment that the Code doesn't otherwise require (UCS-68). See PWHT.
Who supplies the impact test results?
The mill, for the base metal: the results come on the MTR for the heat, tested at the temperature you ordered. The shop supplies weld and heat-affected zone results from its PQR or production test plates. Order plate with the impact test temperature on the purchase order, because adding it later means retesting.
How do I specify MDMT?
Honestly: too warm is unsafe, too cold forces testing you didn't need. Set it from the coldest metal temperature at pressure the vessel will really see, including start-up and upset cases, and write it on the purchase order with its coincident pressure.
When does UCS-66 apply?
To carbon and low-alloy steel parts (Part UCS) of Section VIII Division 1 vessels, the Division ASME describes as covering "pressure vessels operating over 15 psig, fired/unfired". Other materials have their own toughness rules.
What does our software keep for MDMT?
Our US boiler demo prints MDMT on the job's data report layout and files the plates' MTRs by heat number in the ASME record package. It has no separate impact test records. See ERP for boiler and pressure vessel shops.
Quoted from the official text (1)
“ASME BPVC Section VIII Division 1 provides design, fabrication, inspection, testing & certification rules for pressure vessels operating over 15 psig, fired/unfired.”
ASME Section VIII Division 1 product page, description
WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.
A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.
A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.
Official sources
- Boiler and Pressure Vessel Certification. ASME, November 1, 2026.
- BPVC Section VIII Division 1 (2025). ASME, July 1, 2025.
- BPVC Section II Part A: Ferrous Material Specifications (2025). ASME, July 1, 2025.
What this page is not
A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .