Interior design agreement in India: clauses to include
An interior design agreement in India should fix the scope and the drawings it is based on, the BOQ and rates, the design fee, a stage-wise payment schedule tied to work the client can see, how changes are priced and approved, the timeline and what the client must provide, warranty and the snag period, retention, delays on either side, and how disputes are resolved. Most disputes come from what the agreement left out, not from what it said.
Pujan Motiwala · Standards checked against the BIS catalogue on

What should an interior design agreement cover?
Two jobs are often in one agreement: design (drawings, selections, supervision) and execution (building and installing the interiors). Whether you do both or only design, the agreement should say plainly which, because the risks are different. A design-only firm is paid for drawings and advice; a turnkey firm also carries the cost of materials, labour and mistakes on site.
| Clause | What it should say |
|---|---|
| Parties and site | The client, the firm, the GSTINs, the site address and the area covered |
| Scope | Rooms and trades included; drawings and design version the scope is based on |
| Exclusions | What is not included: civil and structural changes, appliances, loose furniture, lights, society and permit charges |
| BOQ and rates | The BOQ as an annexure, with items, specifications, units, quantities and rates |
| Design fee | Basis (percentage, per square foot or lump sum), what it covers, number of revisions included |
| Payment schedule | Stages, share at each, and that payment is due within a set number of days of the invoice |
| Changes | How additions, omissions and substitutions are priced, approved in writing and billed |
| Timeline | Start date, key stages, handover date, and what the client must do and by when |
| Client responsibilities | Site access, power and water, society permissions, timely approvals and payments |
| Materials and brands | Specified brands, and the rule for equivalents if a brand isn't available |
| Measurement | How quantities are measured for billing; see measurement rules |
| Warranty and snags | Warranty by trade and brand, the snag list process and its timeline |
| Retention | A share of each bill or the last payment held until snags are closed |
| Delays | What happens when either side delays, and any extension of time |
| Termination | How either side can end it, and payment for work done to that date |
| Disputes | Discussion first, then mediation or arbitration, the seat and governing law |
How should the scope be fixed?
By reference to specific documents: the approved layout and drawing list with revision numbers, the BOQ, and the material and brand schedule. "Complete interiors of 3BHK" invites argument; "Interiors as per drawings ID-01 to ID-24 revision B and BOQ annexure A" doesn't. When drawings change, the agreement's change clause applies, not a fresh negotiation of the whole job.
How should changes be handled?
In writing, priced before the work, using the BOQ's rates for items that exist and an agreed rate for new items, with the effect on time stated. A change agreed on the phone and settled at the last payment is the most common interior dispute. See variation orders; the CPWD model, which prices changed items at BOQ rates and new items at market rates, is a sensible pattern for private work too.
What retention and warranty terms are usual?
Public works hold a security deposit from every bill; CPWD's contract says "The security deposit shall be collected from the running bills and the final bill of the contractor". Private residential work usually holds the last 5% or so until the snag list is closed. Warranty is set by trade: one year on workmanship is common, with brand warranties on hardware, appliances and finishes passed to the client with their cards. State what the warranty doesn't cover (misuse, water leakage from outside the scope, wear).
What about delays?
Both sides cause them. The firm's delays are usually materials and labour; the client's are approvals, payments and site access. Set out what each side's delay does: an extension of time for client delays, and for firm delays either nothing beyond the obligation to finish or an agreed, modest deduction. Keep a record of each delay as it happens, with the date and cause; at the end, nobody remembers who held up the kitchen.
Should the agreement be stamped?
Agreements in India attract stamp duty under the state's stamp law, at rates and on terms that vary by state and document type. An unstamped or under-stamped agreement may not be accepted as evidence until the duty and penalty are paid. Check the duty for your state and document with your lawyer or the state's e-stamping service.
Is this legal advice?
No. This is a checklist of what interior agreements usually need to say, from the disputes we see in project records. Have your agreement reviewed by a lawyer once, then reuse it. Our interior design system for Savistar & Saag keeps the quotation, the stages that become invoices and the project's progress together, which is the evidence an agreement relies on when there is a disagreement; see software for interior design firms and the interior quotation format.
Quoted from the official text (1)
“The security deposit shall be collected from the running bills and the final bill of the contractor”
CPWD General Conditions of Contract (April 2026), clause 1A
Paste a BOQ from Excel and see what each line leaves open, then print it as a quotation.
Designer Ops keeps your own BOQ library and every quote, turns an accepted quote's payment stages into invoices, then runs the project: orders, site visits and the workshop. Try the live demo · system for interior designers · what to require from one
Official sources
- Indian Standards catalogue (Know Your Standards). Bureau of Indian Standards, October 23, 2026.
- General Conditions of Contract, Construction Works, April 2026 (copy hosted by IIT Hyderabad). Central Public Works Department, April 1, 2026.
What this page is not
A guide written by Ahrom Labs; not legal, tax or engineering advice. Indian Standards are cited by number and title from the BIS catalogue, not quoted; the standard governs wherever this page differs from it. No rates are given: they change with city and month. Last updated .