Form IV Part E: Certificate of manufacture and test of castings

The certificate for castings used in a boiler.

Pujan Motiwala · Checked against the Gazette on · IBR 2026, in force from 1 October 2026

What is Form IV Part E?

Form IV Part E of the Indian Boiler Regulations, 2026 is the certificate of manufacture and test of castings, prescribed under regulation 13 and 50 to 57. Under the Indian Boiler Regulations, 1950 it was Form III-F (certificate of manufacture and test of castings).

Download Form IV Part E as a PDF: the form as notified, cut from the Gazette of India (No. 596, 1 October 2026) with nothing changed.

Who issues and signs Form IV Part E?

The foundry and the Inspecting Authority. Castings from well-known foundries recognised by the Central Boilers Board need no Inspecting Authority signature.

What does Form IV Part E record?

  • Certificate number and date, heat number and date of pouring
  • Maker and customer, drawing numbers, description, quantity and serial numbers
  • Foundry identification
  • Chemical composition and heat treatment
  • Physical tests: tensile strength, transverse bend test, elongation, other tests
  • Signatures of the maker, the Competent Person, and the Inspecting Authority or well-known foundry

When is Form IV Part E filed, and with what?

Supplied with the castings to the buyer and kept with the boiler's records (regulation 308).

What changed for Form IV Part E from IBR 1950?

Under IBR 1950 this was Form III-F. Castings larger than 100 mm must carry the heat number as cast, except investment castings.

  • Form IV Part A: Constructor's certificate of manufacture and test (was Form III)
  • Form IV Part B: Certificate of manufacture and test for pipes (was Form III-A)
  • Form IV Part C: Certificate of manufacture and test for tubes (was Form III-B)
  • Form IV Part D: Certificate of manufacture and test of boiler mountings and fittings (was Form III-C)
  • Form IV Part F: Certificate of manufacture and test of forgings (was Form III-G)
  • Form IV Part G: Certificate of manufacture and test for headers, desuperheaters/attemperators, blowdown tanks, feed water tanks, accumulators and deaerators (was Form III-H)
  • Form IV Part H: Certificate of manufacture and test for dished ends and end covers (was Form III-I)
  • Form XXII: Certificate of manufacture and test for small industrial boilers (was Form XVII)
  • Form XXIII: Certificate of manufacture and test for small solar boilers (was Form XVII)
Quoted from the regulations (3)

“A certificate of manufacture and test in Form-IV(Part-E), signed by the maker and the Inspecting Authority shall be furnished.”

IBR 2026, regulation 13

“in the case of castings manufactured by well known foundries recognised by the Central Boilers Board, signature of Inspecting Authority shall not be required.”

IBR 2026, regulation 13

“for castings of size more than 100mm Heat number must be as Cast except for Investment castings.”

IBR 2026, Form IV Part E

One email when the regulation or a form changes. No newsletter; reply “stop” any time.

See a boiler's IBR folder produced from its material certificates, with a sample company.

Free. Resets every night.

Built for a boiler manufacturer: ERP for boiler manufacturers · how the folder is produced · other rules an ERP must meet

Official sources

What this page is not

A guide written by Ahrom Labs from the Gazette text; not legal advice. The Gazette governs wherever this page differs from it, and a state's Chief Inspector of Boilers may set procedures of their own. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.