Electrical BOQ items: units, measurement, specs

Wiring points, distribution boards, light fittings and data points. 4 items, each with the unit it is priced in, how it is measured, the standard that applies, what the line must name and what quotes leave out.

Pujan Motiwala · Standards checked against the BIS catalogue on

Wiring point (light, fan, socket)

Unit
point; also quoted in nos
How it is measured
By point. State what one point includes: conduit, wire to the board, switch and plate. No Indian Standard fixes this for modular work, so the line itself must say it.
The line must name
  • Wire or cable: for example 1.5 sq mm FRLS copper, CAT6
  • Make and model: the brand and product, or 'or equal' with a named reference
Often left out of the quote
  • Distribution board and MCBs
  • Earthing
  • Chasing walls and making good
  • Light fittings
A line to start from
Wiring [light / 6 A socket / 16 A power] point with [1.5] sq mm FRLS copper wire in concealed PVC conduit, including [make] modular switch and plate; one point measured from the board to the outlet.
Values in [brackets] are yours to fill. Item id: electrical.point

Distribution board and MCBs

Unit
nos
How it is measured
By number, ways and protection stated.
The line must name
  • Make and model: the brand and product, or 'or equal' with a named reference
Often left out of the quote
  • RCCB / ELCB
  • Incoming cable
A line to start from
Providing and fixing distribution board, [8]-way, of [make] with [MCBs and RCCB as per schedule].
Values in [brackets] are yours to fill. Item id: electrical.db

Light fittings

Unit
nos
How it is measured
By number, each fitting named.
The line must name
  • Make and model: the brand and product, or 'or equal' with a named reference
Often left out of the quote
  • Drivers for LED strips
  • Profiles
A line to start from
Supplying and fixing [make, model] [10] W LED downlight, [3000] K.
Values in [brackets] are yours to fill. Item id: electrical.fittings

Data or TV point

Unit
point; also quoted in nos
How it is measured
By point, cable type stated.
The line must name
  • Wire or cable: for example 1.5 sq mm FRLS copper, CAT6
  • Make and model: the brand and product, or 'or equal' with a named reference
Often left out of the quote
  • Router or switch
  • Termination and testing
A line to start from
Providing [CAT6] data point in concealed conduit with [make] modular socket.
Values in [brackets] are yours to fill. Item id: electrical.data

Paste a BOQ from Excel and see what each line leaves open, then print it as a quotation.

Free. Runs in your browser; the rows never leave it.

Designer Ops keeps your own BOQ library and every quote, turns an accepted quote's payment stages into invoices, then runs the project: orders, site visits and the workshop. Try the live demo · system for interior designers · what to require from one

Official sources

What this page is not

A guide written by Ahrom Labs; not legal, tax or engineering advice. Indian Standards are cited by number and title from the BIS catalogue, not quoted; the standard governs wherever this page differs from it. No rates are given: they change with city and month. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.