Plumbing and bathrooms BOQ items: units, measurement, specs

Concealed piping, waterproofing, sanitaryware and CP fittings. 4 items, each with the unit it is priced in, how it is measured, the standard that applies, what the line must name and what quotes leave out.

Pujan Motiwala · Standards checked against the BIS catalogue on

Concealed water supply piping

Unit
point; also quoted in running ft, running m, lump sum
How it is measured
By point or by running length; state which, and what a point includes. No Indian Standard fixes this for modular work, so the line itself must say it.
Indian Standards
IS 1200 (Part 19), Method of measurement of building and civil engineering works: water supply, plumbing and drains.
The line must name
  • Pipe material and size: CPVC, PPR, UPVC, with size
  • Make and model: the brand and product, or 'or equal' with a named reference
Often left out of the quote
  • Pressure test
  • Chasing and making good
  • Concealed diverter bodies
A line to start from
Providing concealed water supply piping in [CPVC / PPR] of [make], [20] mm, including fittings and pressure test; measured by point.
Values in [brackets] are yours to fill. Item id: plumbing.piping

Bathroom waterproofing

Unit
sq ft; also quoted in sq m
How it is measured
By area treated, wall upturn included; state the upturn height.
The line must name
  • Make and model: the brand and product, or 'or equal' with a named reference
  • Number of coats: putty, primer and finish coats
Often left out of the quote
  • Ponding test
  • Protective screed over the membrane
A line to start from
Waterproofing bathroom floor and walls up to [300] mm with [make, system] in [two] coats, including ponding test.
Values in [brackets] are yours to fill. Item id: plumbing.waterproofing

Sanitaryware

Unit
nos
How it is measured
By number, each piece named.
The line must name
  • Make and model: the brand and product, or 'or equal' with a named reference
Often left out of the quote
  • Concealed cistern
  • Seat cover
  • Fixing accessories
A line to start from
Supplying and fixing [make, model] [wall-hung WC / counter-top basin], including fixing accessories.
Values in [brackets] are yours to fill. Item id: plumbing.sanitary

CP fittings (taps, mixers, showers)

Unit
nos; also quoted in set, lump sum
How it is measured
By number, each fitting named; a lump sum per bathroom hides what's inside.
Indian Standards
IS 1200 (Part 19), Method of measurement of building and civil engineering works: water supply, plumbing and drains.
The line must name
  • Make and model: the brand and product, or 'or equal' with a named reference
Often left out of the quote
  • Concealed bodies for diverters
  • Angle valves
  • Health faucet
A line to start from
Supplying and fixing [make, model] [single-lever diverter / basin mixer / overhead shower].
Values in [brackets] are yours to fill. Item id: plumbing.cp-fittings

Paste a BOQ from Excel and see what each line leaves open, then print it as a quotation.

Free. Runs in your browser; the rows never leave it.

Designer Ops keeps your own BOQ library and every quote, turns an accepted quote's payment stages into invoices, then runs the project: orders, site visits and the workshop. Try the live demo · system for interior designers · what to require from one

Official sources

What this page is not

A guide written by Ahrom Labs; not legal, tax or engineering advice. Indian Standards are cited by number and title from the BIS catalogue, not quoted; the standard governs wherever this page differs from it. No rates are given: they change with city and month. Last updated .

Talk to us about your systems.

Tell us what's held together with workarounds right now. We reply to every message ourselves.