Construction billing and job cost: guides for contractors
A contractor is paid in stages against work measured or certified, with part of each payment held back until the job is done. How that works depends on the country: in the US, pay applications, retainage, lien waivers and change orders; in India, running account bills, the measurement book, TDS and GST on works contracts. These guides explain each, quoted from the laws and official manuals, and what your system has to record.
Pujan Motiwala · Written for contractors and subcontractors · Checked against the statutes and official manuals cited on

How does a contractor get paid on a US job?
By a monthly pay application against the schedule of values, less retainage (5% or 10%, capped by some states), with lien waivers exchanged for each payment and change orders billed only once approved. The WIP schedule then shows, job by job, whether billing is ahead of the work or behind it.
How does a contractor get paid in India?
By running account bills drawn from the measurement book, less security deposit, TDS and any advance being recovered, with GST on top, and a final bill that closes the contract.
Short answers to every guide on one page: Construction billing questions, answered.
Contractors in the US
Getting paid on a US or Ontario job: pay applications, retainage, lien waivers, change orders and the WIP schedule, and what each state allows.
- Pay applications (AIA G702 and G703), explained
A pay application is a contractor's monthly bill on a construction job: each line of the schedule of values with the work completed before and this period, materials stored, the retainage held back, and the amount now due. AIA's G702 is the one-page summary and certificate; G703 is the line-by-line continuation sheet. The architect or owner certifies the amount before the owner pays.
- Retainage in construction: rates, state caps and release
Retainage is a share of each progress payment, often 5% or 10%, that the owner holds back until the work is complete, as security that the contractor finishes and fixes defects; the general contractor usually holds the same from its subs. Several states cap it at 5%, including California and New York on private jobs, and set a deadline to release it after completion. On federal jobs it is withheld only for unsatisfactory progress.
- Lien waivers: conditional, unconditional, progress, final
A conditional lien waiver gives up lien rights only once the payment actually reaches the signer; an unconditional waiver is effective when signed, paid or not. Each comes in a progress and a final version. Several states, including Arizona, California, Florida, Massachusetts, Michigan, Texas and Wyoming, set the wording by statute, and a waiver that doesn't follow the statutory form can be unenforceable.
- Mechanics lien deadlines and preliminary notices by state
It depends on the state and your place in the chain. In California a sub sends a preliminary notice within 20 days of starting and records a lien within 90 days of completion (30 days after a notice of completion); in Florida the notice to owner is due within 45 days and the lien within 90 days of last work; Texas counts to the 15th day of a later month; New York allows 8 months. On federal jobs you claim against the payment bond instead.
- Prompt payment acts: how fast contractors must be paid
Prompt payment laws set how fast each tier must pay and what it owes if it's late. On federal jobs a progress payment is due 14 days after a proper request and subs are paid within 7 days of the prime. In Texas a private owner pays within 35 days and the contractor pays subs within 7; California sets 30 days and 7; New York 30 days after approval and 7. Late money carries interest, often 1% to 2% a month.
- Change orders in construction: pricing, approval, billing
A change order is a written agreement changing a construction contract's work, price or time, signed by owner and contractor (AIA's form is G701); a construction change directive (G714) orders changed work before the price is agreed. Get every change in writing before doing it, price it with backup, and bill it only once approved, as its own line on the pay application. Federal jobs give 30 days to assert an adjustment.
- The WIP schedule: over and under billing, explained
A WIP (work-in-progress) schedule lists every open job with its contract value, estimated total cost, cost to date, percent complete and billings to date. Percent complete is cost to date over estimated total cost; earned revenue is that share of the contract value. Billed more than earned is overbilling, less is underbilling. Banks and surety companies read it to judge a contractor's jobs, and it's the earliest warning of a job losing money.
- Certified payroll under Davis-Bacon: WH-347 explained
Certified payroll is the weekly payroll report a contractor and each sub must submit on a federal or federally assisted construction contract over $2,000 covered by the Davis-Bacon and Related Acts. It lists every laborer and mechanic, their classification, hours, rates, fringe benefits, deductions and pay, with a signed Statement of Compliance that each was paid at least the prevailing wage. DOL's Form WH-347 is optional; the weekly report isn't.
- Submittals and RFIs: how they flow and what to log
A submittal is something the contractor sends for the design team's review before building or buying: shop drawings, product data, samples. An RFI (request for information) is a question about the contract documents, sent when the drawings or specifications are unclear or conflict. Both need a log with numbers, dates, ball-in-court and answers, because late or unanswered ones are a common source of delay and change order claims.
- Punch lists and project closeout: getting retainage released
A punch list is the list of work still incomplete or not to standard when the job is substantially complete. Once it is done and the closeout documents are in (warranties, manuals, as-builts, final lien waivers), the contractor submits the final pay application and the retainage is released. Unfinished punch items and missing closeout documents are the usual reasons retainage sits unpaid for months.
- Construction cost codes: setting them up for job costing
Use a short list of cost codes for the work you actually do, each split by cost type (labor, material, equipment, subcontract, other), and use the same codes on the estimate, the budget, timesheets, purchase orders and bills. Many contractors base the list on CSI MasterFormat divisions. The test is whether each code can answer "are we over or under on this part of the job?" while it is still running.
- Holdback and prompt payment in Ontario's Construction Act
Ontario's Construction Act requires every payer on a contract or subcontract to hold back 10% of the price of the work as it is supplied, until the lien period expires, plus a separate 10% on finishing work after substantial performance. Prompt payment rules run alongside: an owner pays a proper invoice within 28 days unless it gives a notice of non-payment within 14 days, and a contractor pays its subs within 7 days of being paid.
Contractors in India
Running bills against the measurement book, with security deposit, advances and the final bill, TDS on payments to contractors and GST on works contracts.
- RA bills: deductions, advances and the final bill
A running account (RA) bill is a contractor's interim bill for work measured so far, paid as an advance against the final bill while the work goes on. Each is drawn from the measurement book, to date less earlier bills, with GST on top and deductions taken off: security deposit (2.5% of each bill on CPWD works), TDS, GST TDS on government work, and recovery of any mobilisation or secured advance. The final bill closes the contract.
- Measurement book (MB): recording work for payment
The measurement book (MB) is the record of every quantity of work done, measured on site item by item, from which each running bill and the final bill is paid. In CPWD and most government works, measurements follow the contract's rules of measurement, are test-checked by senior engineers, and are now entered electronically as an e-MB; private contractors keep the same record for their clients and subcontractors.
- Price escalation in CPWD contracts: clause 10CC worked out
Clause 10CC of CPWD's General Conditions of Contract 2023 adjusts the contract price each quarter for rises and falls in the prices of cement, steel, labour, fuel and other materials. It applies to 85% of the work done in the quarter, split by the component percentages in Schedule F, and moves each component by the change in its index since the last date for tenders. Where 10CC doesn't apply, clause 10C pays only for changes caused by new laws.
- Performance guarantee, security deposit and defect liability
On a CPWD work the contractor gives a performance guarantee, usually 5% of the tendered amount as a bank guarantee or other listed instrument, valid to the stipulated completion date plus at least 6 months, and returned after the completion certificate. Security deposit, 2.5%, is deducted from bills and refunded after the defect liability period, 12 months from completion (6 months on works up to ₹10 lakh), or once the final bill is passed.
- TDS on payments to contractors under the 2025 Act
Under the Income-tax Act, 2025, in force from 1 April 2026, a payer deducts tax at 1% on payments to a contractor who is an individual or HUF and 2% to any other contractor, for any work under a contract, including supply of labour. It applies once a single payment exceeds ₹30,000 or the year's total exceeds ₹1,00,000. The rule replaces section 194C of the 1961 Act: it is now section 393(1), Table serial 6.
- GST on works contracts: rate, ITC and GST TDS
Under GST, a works contract is a contract for building, construction, repair or similar work on immovable property where goods pass to the client in the course of the work. It is a supply of services, taxed as one composite service on the whole value, generally at 18% (9% CGST + 9% SGST) where the property is. Government clients deduct GST TDS (1% CGST + 1% SGST) on contracts over ₹2.5 lakh, and input tax credit is blocked for building your own premises.
- Labour cess on construction: the 1% BOCW cess explained
Labour cess (the building and other construction workers' cess) is 1% of the cost of construction, excluding land, paid by the employer carrying out building or other construction work to the state's Building Workers' Welfare Board. It now sits in section 100 of the Code on Social Security, 2020, which repeals the 1996 Cess Act, and the 1% rate was notified under it on 8 May 2026: the Code allows between 1% and 2%, and 1%, the minimum, is the rate in force. Government and PSU clients deduct it from contractors' bills.
- Contract labour compliance for contractors: licence, wages, PF
Contract labour now falls under the Occupational Safety, Health and Working Conditions Code, 2020, which repeals the Contract Labour (Regulation and Abolition) Act, 1970. A contractor with 50 or more contract workers needs a licence, valid five years; it pays wages through the bank and tells the principal employer, who must pay if the contractor doesn't. Under the Code on Social Security, PF applies at 20 employees and ESIC at 10.
- Daily progress reports and site records for contractors
A daily progress report (DPR) records, for one site and one day, the work done against each BOQ item, the labour and machines on site, material used, weather, hindrances and photos, so progress, cost and delays can be proved later. On CPWD works the official site records are the site order book, the cement register and an online inspection register; hindrances go in the site order book. A DPR from the phone feeds all of them.
- Material consumption vs BOQ: theoretical quantity and wastage
Work out the theoretical quantity each BOQ item should have used, from its consumption norm and the work done, and compare it with the material actually issued to the site. On CPWD works Clause 38 of the GCC sets the rule: cement and bitumen from the Schedule of Rates constants, steel as designed plus 3% for cutting, pipes and cables plus 5%, sheets plus 10%, with a further variation allowed in Schedule F. Beyond that, the difference is questioned.
- Job cost and margin per site for construction contractors
Add up every cost that belongs to the site (material used, site labour, plant and machines, site cash and subcontractors) and set it against the value of work done to date: the difference is the margin so far. Divide cost to date by progress to project the final cost, and compare it with the estimate. ICAI's AS 7 defines which costs belong to a contract, and says a loss expected on a contract is recognised at once, not when the job ends.
- Rate analysis for construction items: CPWD method with example
Rate analysis builds the rate of one unit of an item (a cubic metre of concrete, a square metre of plaster) from the materials, labour, and tools and plant it takes, plus water charges and the contractor's overheads and profit. CPWD's Schedule of Rates and Analysis of Rates are the usual reference, and items not in the schedule are analysed from market rates.
- RERA for builders: the 70% account, withdrawals and records
Under the Real Estate (Regulation and Development) Act, 2016, a promoter registers each project with the state RERA, deposits 70% of the money collected from buyers in a separate account for that project, withdraws it only in proportion to completion as certified by an engineer, an architect and a chartered accountant, has the account audited every year, and is liable for structural defects for five years after possession.
What software do contractors use for billing and job cost?
Usually the books (TallyQuickBooks) plus spreadsheets for everything that happens on site. We build the operations system for construction contractors that starts on site, with daily reports, measurements, bills, stores, site cash and each site's cost, and hands the books what they need, as a custom ERP. It was built for a waterproofing and repair contractor, and runs there today.
The construction democonstruction demo runs it on a sample contractor with a login per role: RA bills with GST, measurements, stores, site cash and payroll with PF and ESICpay applications with retainage, change orders, lien waivers and crew pay. Its assistant, Datum AI, answers questions from the project records with the same figures as the screens.
Bills, measurements, retention, change orders and job cost in one system, from site to accounts. Start with a working prototype of your main workflow, on your own data, credited to the build if you continue.
Daily reports, bills and stores for a sample contractor, with sample logins: try the construction demotry the construction demo. Its assistant, Datum AI, answers from the project records.
Official sources
What this page is not
A guide written by Ahrom Labs, a software company that builds operations systems for contractors. Laws, contract forms and manuals are explained from the texts cited, on the date shown; your contract and your state's or the department's current rules govern. Not legal, tax or accounting advice. AIA is a trademark of The American Institute of Architects; Ahrom Labs is not affiliated with it. Last updated .
Talk to us about your systems.
Tell us what's held together with workarounds right now. We reply to every message ourselves.