ASME data reports: U-1, U-1A, U-2, P-2 and H-2 forms
A Manufacturer's Data Report is the signed record of what a stamped boiler or pressure vessel is: design conditions, materials, thicknesses, joints, examinations and test pressure, certified by the manufacturer and the Authorized Inspector. U-1A is the alternative form for single-chamber Section VIII Division 1 vessels; U-1 covers the rest, U-2 parts, A-1 Division 2, P-2 and P-3 Section I boilers, H-2 heating boilers.
Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

Video chapters (10)
- 0:00What an ASME Data Report Is (UG-120 & Jan 1, 2026 Cutoff)
- 0:21Nameplate vs. Data Report, 2025 U-1A Field Update & U-1 + U-5 Exchangers
- 0:43Which Form Matches Your Item (U-1, U-1A, A-1, K-1, P-2, H-2 & Free PDFs)
- 1:02What Goes Inside Form U-1A (4 As-Built Field Groups)
- 1:222025 Mandatory Revisions, Paper Format Rules & National Board EDT
- 1:44Dual AI Sign-Off, UG-120 Retention, 30-Day NB-264 Filing & IBR 2026
- 2:05Official ASME Form & National Board NB-264 Excerpts
- 2:24The Supporting Data Book & Pre-Filing U-1A / P-2 Packages in Boiler ERP
- 2:442025 Edition Notice & Authorized Inspector Verification
- 3:00National Board Registration, Authorized Inspector & Sheet S16 Next
What is a Manufacturer's Data Report?
A Manufacturer's Data Report is the signed record of a stamped boiler, vessel or part as built: who made it and for whom, design conditions, materials, thicknesses, joints, examinations, heat treatment and test pressure, certified by the manufacturer and by the Authorized Inspector. It is what the stamp points to: the nameplate says the item is a Code item, and the data report says what that item is. Section VIII Division 1 sets its data report rules in UG-120 (2025 Edition).
Which data report form do I use?
The form follows the Code section and the kind of item. ASME publishes them free as fillable PDFs on its data report forms page; the ones most shops use:
| Item | Form |
|---|---|
| Section VIII Div. 1 vessel | U-1, or U-1A (alternative form for single-chamber vessels) |
| Part of a Div. 1 vessel built by another shop | U-2 or U-2A (partial data report) |
| Plate heat exchanger | U-1P |
| Supplementary sheet, shell-and-tube heat exchanger | U-5 |
| Owner's design conditions | U-DR-1 (single chamber) or U-DR-2 (multi-chamber) |
| Section VIII Div. 2 vessel | A-1 (A-2 for parts) |
| Section VIII Div. 3 vessel | K-1 (K-2 for parts) |
| Section I boiler, except watertube and electric | P-2 (P-2A electric) |
| Section I watertube boilers, superheaters, waterwalls, economizers | P-3 |
| Section I parts and fabricated piping | P-4 and P-4A |
| Section IV boiler, except watertube and cast iron | H-2 (H-3 watertube, H-5 and H-5A cast iron and cast aluminum) |
| Section XIII relief valve or rupture disk | Certificates of conformance (UV-1, UD-1 and others) |
| B31.1 power piping | CC-1 and CC-2 certificates of compliance |
What is the difference between U-1 and U-1A?
U-1A is the shorter alternative to U-1 for a single-chamber vessel. ASME's 2025 form is titled for "Single Chamber, Completely Shop- or Field-Fabricated Vessels Only", so it now covers field-fabricated single-chamber vessels too. Use U-1 for multi-chamber vessels such as heat exchangers (with the U-5 supplementary sheet for shell-and-tube units).
What goes in a U-1A?
The report describes the vessel as built, not as quoted:
- manufacturer, purchaser and installation location, serial and National Board numbers;
- design pressure, MAWP at its coincident temperature, and the MDMT;
- for each shell and head: material specification and grade, nominal thickness and corrosion allowance, inside diameter, length, joint efficiency and type, extent of radiography;
- nozzles and openings, with their reinforcement;
- heat treatment (PWHT) and impact testing;
- the hydrostatic or pneumatic test pressure;
- code cases used, and parts from other shops, with their U-2 reports attached;
- certification by the manufacturer and by the Authorized Inspector.
Which edition of the forms must I use?
The 2025 forms, for anything built to the 2025 Code. The National Board's registration page says the 2025 revisions to the ASME and NBIC report forms became mandatory on 1 January 2026, and that reports on outdated forms are returned for correction. ASME's forms page stars the forms revised or new in the 2025 Edition (U-1, U-1A, U-2, P-7, H-2 among them) and marks the metric versions such as P-2M and P-3M with a double star: "Form no longer included in Code". See ASME Code editions.
Can I make my own layout of the form?
Not for a report sent on paper to the National Board: it must be in the exact format and content of the form in the Code and the NBIC, with National Board minimum font sizes, and a multi-page report must repeat its header and leave space for the company representative and the Authorized Inspector to initial each page. ASME's own forms page warns users to keep track of font and field size. A shop's software can still assemble the data and fill the official form, or send it through the National Board's Electronic Data Transfer (EDT).
Who signs the data report?
The manufacturer's representative certifies that the item meets the Code, and the Authorized Inspector certifies that they inspected it; for a registered item the registration form bears the Inspector's signature and National Board commission number. Without the Inspector's signature the item can't be stamped.
How long must the shop keep the data report?
Division 1 requires the manufacturer to keep a copy for a period set in UG-120, or to register it with the National Board, which keeps it permanently. Registration also means an owner can get a copy at any later inspection, repair or sale. See National Board registration.
How soon must a data report be filed with the National Board?
Within 30 days of certification. The National Board's criteria for registration (NB-264, Revision 19) require a manufacturer authorized to register to submit registration forms no more than 30 days after the Inspector certifies the item. Many US jurisdictions require registration before installation; see US and Canadian boiler laws.
What sits behind the one-page report?
The file the Inspector checked: calculations, drawings, MTRs, weld map, WPS, PQR and welder qualifications, NDE reports, heat treatment charts and the test record. Assembling that file at the end of a job is where most shops lose days; purchasers usually want it bound as a data book. Our US boiler demo builds it as the job runs and prints it as one record package: a Form U-1A or P-2 layout (our own, carrying the form's fields, not ASME's form; file the official form or use EDT), the weld map with welder stamps, WPS and PQR, QW-322 continuity, MTRs by heat number, NDE, PWHT and the hydro test. See ERP for boiler and pressure vessel shops.
What is the Indian equivalent?
Under IBR 2026 the equivalents are the maker's certificate (Form IV Part A) and the Inspecting Authority's certificate (Form I); see IBR Form I Part A, boiler registration documents and ASME vs IBR 2026.
Quoted from the official text (14)
“Manufacturer's Data Report for Pressure Vessels (Alternative Form for Single Chamber, Completely Shop- or Field-Fabricated Vessels Only)”
ASME Data Report Forms, Section VIII Division 1
“Manufacturer's Partial Data Report (Alternative Form)”
ASME Data Report Forms, Section VIII Division 1
“Manufacturer's Data Report Supplementary Sheet Shell-and-Tube Heat Exchangers”
ASME Data Report Forms, Section VIII Division 1
“Manufacturers' Data Report for All Types of Boilers Except Watertube and Electric”
ASME Data Report Forms, Section I
“Manufacturers' Data Report for Fabricated Piping”
ASME Data Report Forms, Section I
“Manufacturer's Data Report for All types of Boilers Except Watertube and those Made of Cast Iron”
ASME Data Report Forms, Section IV
“* Revised or new in the 2025 BPVC Edition.”
ASME Data Report Forms, legend
“** Form no longer included in Code”
ASME Data Report Forms, legend
“Users of these forms should keep track of the font and field size when filling in data in order to meet regulatory or customer needs.”
ASME Data Report Forms, note
“The 2025 revisions to the ASME BPV Code and NBIC report forms became mandatory on January 1, 2026.”
NBBI Data Report Registration, form revisions
“All data report forms submitted to the National Board for registration on outdated forms will be returned for correction.”
NBBI Data Report Registration, form revisions
“Data report forms must be in the exact format and have the same content as those found in the ASME BPV Code and the NBIC.”
NBBI Data Report Registration, paper forms
“There must also be space for the company representative and authorized inspector to initial each page.”
NBBI Data Report Registration, paper forms
“The timeframe in which registration forms will be submitted to NBBI following certification by the Inspector or CI shall not exceed 30 days.”
NB-264 Revision 19, submitting registration forms
WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.
A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.
A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.
Official sources
- Boiler and Pressure Vessel Certification. ASME, November 1, 2026.
- ASME Data Report Forms. ASME, November 5, 2026.
- Manufacturer's Data Report Registration. The National Board of Boiler and Pressure Vessel Inspectors, November 5, 2026.
- NB-264, Criteria for ASME Registration (Revision 19). The National Board of Boiler and Pressure Vessel Inspectors, May 10, 2025.
- 2025 ASME Boiler and Pressure Vessel Code (Section VIII, Division 1). ASME, July 1, 2025.
What this page is not
A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .
Talk to us about your systems.
Tell us what's held together with workarounds right now. We reply to every message ourselves.