The ASME quality control manual: what it must cover
An ASME quality control manual describes, in English, how the shop meets every Code requirement in its scope: who has authority, how drawings and calculations are controlled, how material is received and traced, welding, NDE, heat treatment, calibration, nonconformities, inspection and records. The joint review checks the manual against ASME's checklist, then watches the shop work the way it says.
Pujan Motiwala · Written to the ASME BPVC 2025 Edition · checked against ASME's and the National Board's public pages on

Video chapters (10)
- 0:00What an ASME Quality Control Manual Must Cover (Overview)
- 0:22All 13 Appendix 10 System Elements (01–13 Breakdown)
- 0:44Format Flexibility vs. Mandatory English Rule (BPV-GUI-03 §3)
- 1:05ASME's 4 Review Checklists, Paragraph Mapping & CA-1 Rules
- 1:26Why Bought QC Manual Templates Fail (Put Real Forms in Section 12)
- 1:46How Reviewers Audit 1 Demo Weld Backward Across 6 Links
- 2:09Post-Cert Oversight: AI Hold Points, AIA Audits & 7 Official Excerpts
- 2:29Ending Broken Paper Binders: Linking Heats, Welds & NCRs in ERP
- 2:482025 Edition & Authorized Inspector Verification Notice
- 3:00Next Steps: Authorized Inspector (S21), U Stamp & Material Traceability
What should an ASME quality control manual include?
Every element of the quality control system the Code lists for the shop's scope, described as the shop actually works. ASME's handbook puts it plainly: the applicant "must address each element of the QCS in the Code", but "need only demonstrate those elements within the intended scope of activities that apply to their program". For Section VIII Division 1 the elements are listed in its quality control system appendix (Mandatory Appendix 10); Section I and the other construction sections have equivalents. In outline:
| Element | What the manual says |
|---|---|
| Authority and responsibility | Who is responsible for quality, and that they can stop work |
| Organization | An org chart showing the quality function's independence |
| Drawings, calculations and specifications | How they are prepared or received, checked, approved, revised and issued |
| Material control | Receiving, checking against the MTR, marking and traceability through cutting |
| Examination and inspection program | What is checked, when, and the Inspector's hold points; each job's ITP applies it |
| Correction of nonconformities | How a nonconformity is recorded, decided and closed; see NCRs |
| Welding | WPS, PQR and WPQ control, welder identification, continuity |
| Nondestructive examination | Procedures to Section V, personnel qualification |
| Heat treatment | Procedures and records, including PWHT charts |
| Calibration | Gauges and test equipment, intervals and records |
| Records retention | Which records are kept, where, for how long |
| Sample forms | Every form the manual refers to |
| Inspection of vessels and parts | How the Authorized Inspector is given access and information |
Does the manual have to follow ASME's format?
No. The handbook says "The Manual need not follow the format of this Guide." What it must do is cover every element for the scope, and the shop must show where: ASME's review checklist (below) maps each element to the manual's own paragraphs.
Does the manual have to be in English?
Yes. The handbook requires that "The written description and documentation which support understanding of the program must be in English." A shop in India or elsewhere may run the floor in another language, but the manual and the documents the review team reads are in English.
What is ASME's review checklist?
The "Guide for ASME Review Teams for Review of Applicants": a checklist of the quality control system's elements for the certificate applied for. ASME has four: one for pressure relief devices, one for RP (Section X), one for cast iron and cast aluminum H boilers, and a General checklist for A, M, PP, S, E, H, HLW, U, UM, U2, U3, PRT and T. The applicant fills in, against each element, the paragraph of its manual that addresses it, and gives the completed guide to the review team.
What is CA-1 and does the manual need it?
CA-1 is ASME's Conformity Assessment Requirements standard, which ASME now lists among the required code books for every boiler and pressure vessel certificate. Buy it with the Code sections for your scope and check the manual against both; where the 2025 construction section and CA-1 place a quality system requirement is worth confirming with your Authorized Inspection Agency before the review.
Can I buy a quality control manual template?
You can, but it has to describe your shop, and ASME won't write it for you: its FAQ says "ASME does not provide consulting services to develop a Quality Control System". A bought template with another company's job titles and forms fails the moment the team asks someone to show a step. Every form in the manual should be the form used on the shop floor.
How does the joint review test the manual?
It reads the manual, then watches the shop do what it says. The handbook describes an on-site evaluation of both the written description and "a demonstration of implementation of the program", which may use "current work, a mock-up, or a combination of the two". A reviewer typically picks a weld on the demonstration item and follows it to the welder, their qualification and continuity, the WPS, the PQR, the filler metal and the NDE report; each link has to be there. See how to get the U stamp.
Who checks the manual is followed after certification?
The Authorized Inspector, on every job and at the agency's periodic audits, and the next joint review at renewal. The manual's hold points are where the Inspector signs off, so the manual and the job's inspection plan should name the same ones.
How should records be kept so the manual works?
So that each link is recorded once: a record per weld, heat number and welder, joined to the job, rather than files cross-referenced by hand. That is the test most shops find hardest on paper. Our US boiler demo keeps nonconformities (with a QC verification step before an NCR can close), incoming inspection, hold points and the welding and material records on each job, and prints the job's ASME record package from them. See material traceability.
Quoted from the official text (7)
“While the Applicant must address each element of the QCS in the Code, the Applicant need only demonstrate those elements within the intended scope of activities that apply to their program.”
ASME BPV-GUI-03, section 3
“The Manual need not follow the format of this Guide.”
ASME BPV-GUI-03, section 3
“The written description and documentation which support understanding of the program must be in English.”
ASME BPV-GUI-03, section 3
“The Applicant is required to indicate the corresponding cross references to the provisions in their written description (QC Manual) which address these elements.”
ASME BPV-GUI-03, section 3
“they may be demonstrated using current work, a mock-up, or a combination of the two.”
ASME BPV-GUI-03, section 3
“ASME does not provide consulting services to develop a Quality Control System that will meet the requirements of the ASME Boiler and Pressure Vessel Code.”
ASME FAQ, Boiler and Pressure Vessel Certification
“CA-1 Conformity Assessment Requirements”
ASME Required Code Books, U and UM certificates
WPS and PQR registers, welder continuity, heat numbers from receipt to nameplate, and the data report package: the records a Code shop keeps, in one system.
A boiler manufacturer's system, from enquiry to dispatch and the IBR folder, with sample logins: try the live demo.
A boiler and pressure vessel shop's system, from inquiry to shipping and the ASME data report package, with sample logins: try the live demo. Fixed price, scope agreed before work starts: see the prices.
Official sources
- Boiler and Pressure Vessel Certification. ASME, November 1, 2026.
- Boiler and Pressure Vessel Certificates of Authorization and the Certification Mark: Informational Handbook (BPV-GUI-03). ASME, May 12, 2023.
- Frequently Asked Questions (Certification and Accreditation). ASME, November 5, 2026.
- Required Code Books. ASME, November 5, 2026.
- BPVC Section VIII Division 1 (2025). ASME, July 1, 2025.
What this page is not
A guide written by Ahrom Labs, not engineering advice, and not yet reviewed by an Authorized Inspector. The ASME Code is copyrighted and sold by ASME: paragraphs are cited by number and explained in our own words, never reproduced. Check every figure against your copy of the 2025 Edition and with your Authorized Inspector before relying on it. Last updated .